NV Energy interconnection application

NV Energy is an investor-owned utility serving 933,357 residential customers in Nevada (EIA-861, 2025). Applications: PowerClerk (NV Energy Net Metering PowerClerk). Gridpol files NV Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from NV Energy’s official sources (see below). PowerClerk URL not shown in handbook (accessed via nvenergy.com).

NV Energy at a glance

Utility

Nevada Power Co (Berkshire Hathaway Energy)

Type

Investor-owned utility

EIA utility ID

13407

Residential customers

933,357 (EIA-861, 2025)

Net-metered residential customers

124,293 (EIA-861, 2025)

Service territory

2 counties in Nevada

How to apply

PowerClerk – NV Energy Net Metering PowerClerk

Who submits

Applicant (often installer) chosen by host customer to apply on their behalf. Interconnection by NV-licensed C-2/C-2g contractor; owner self-install allowed.

Export compensation

NEM – NMR-405 (≤25 kW) / NMR-B (>25 kW-1 MW)
Per NV Energy handbook rev 10/16/2025

Review time (official)

Application Review within 10 business days (incl. engineering/metering review); Documentation Review + inspection queue within second 10 business days; corrections due within 60 days; 1 year to submit final documentation.

Documents NV Energy asks for

  • Interconnection application formPowerClerk application; incomplete until fee paid Gridpol prepares this.
  • Site plan / site layoutAddress, all components, access issues, company name + license no. Gridpol prepares this.
  • Single-line diagram (one-line)Single- or three-line incl. existing generation/storage, specs Gridpol prepares this.
  • Battery spec sheet (when applicable)Nameplate energy capacity, max charge/discharge power
  • Final inspection sign-offPermit with attached final inspection results; PE verification where no building official
  • Interconnection agreementAll pages; Attachment B if storage; names/account/premise/size must match PowerClerk
  • Other utility-specific document (when applicable)Installation contract only if rented property; Proof of property ownership or Property Transfer Agreement; UL recertification report if busbar modified
  • Load calculation (when applicable)No 12-month history: energy audit report or PE-stamped engineering calculation or sq-ft method (N: 2.5 W/sf, S: 3.5 W/sf)

How the NV Energy process runs

  1. Submit application in PowerClerk and pay fee
  2. Application Review (sizing approval) within 10 business days
  3. Install, obtain permit and final inspection
  4. Upload permit/final, sign IA (and PTA) - Documentation Review
  5. NV Energy safety inspection and meter set
  6. Permission to Operate email

Fees

FeeApplies toNote
$189Initial review fee per net metering application (Southern Nevada)Rule 15; due within 30 days or application cancelled

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
NMR-405 Tier 425 kWdefault rate ≤25 kW
NMR-B1000 kW>25 kW to 1 MW; engineering review typical
Rule 1520000 kW>1 MW to 20 MW separate process
Net metering cap1000 kW

Sized ≤100% of annual requirements (highest 12 consecutive months of last 24).

Storage, EV and stamps

Battery storage

Battery projects routed to Metering Technical Review; battery backup requires advance review; Energy Storage Meter may be installed; RE-3 standard.

EV chargers

Added EVs are an accepted reason for PE engineering usage calculation when sizing.

PE stamp

PE wet-stamped load calculations when used for sizing; PE verification of code compliance where no building official. – PE-stamped drawings are not included in Gridpol.

Common issues the utility lists

  • Names/account/premise/size on IA not matching PowerClerk
  • Missing IA pages or Attachment B for storage
  • Permit without attached final inspection results
  • System sized >100% of annual usage
  • Installed system significantly larger than approved

Gridpol’s pre-submission check covers these before we file.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited