Nevada interconnection applications
19 electric utilities serve Nevada (EIA-861, 2025): 3 investor-owned utilitys, 7 electric cooperatives, 4 public power districts, 3 municipal utilitys, 1 federal power agency, 1 state power authority. Together they serve 1,325,457 residential customers; 142,497 residential customers were on net metering at year-end 2025.
Largest utilities in Nevada
Investor-owned utility · 933,357 residential customers · Nevada
Applications: PowerClerk – NV Energy Net Metering PowerClerk
Interconnection process and documents →Investor-owned utility · 334,961 residential customers · Nevada
Applications: PowerClerk – NV Energy Net Metering PowerClerk
Interconnection process and documents →Electric cooperative · 22,740 residential customers · Nevada
Interconnection process and documents →Public power district · 15,852 residential customers · Nevada
Interconnection process and documents →Municipal utility · 7,157 residential customers · Nevada
Interconnection process and documents →Electric cooperative · 5,387 residential customers · Nevada
Interconnection process and documents →Electric cooperative · 5,161 residential customers · Nevada
Interconnection process and documents →Electric cooperative · 3,352 residential customers · Nevada
Interconnection process and documents →Electric cooperative · 4,009 residential customers · Nevada
Interconnection process and documents →Investor-owned utility · 4,627,247 residential customers · Nevada
Applications: PowerClerk – SCE Interconnection Online Application System
Interconnection process and documents →Electric cooperative · 8,172 customers · Nevada
Interconnection process and documents →Municipal utility · 5,012 customers · Nevada
Interconnection process and documents →Export compensation among the researched Nevada utilities: NEM, Net billing. Rules differ by utility – see each utility page.
Nevada interconnection rule
No statewide small-generator interconnection rule with levels; technical process, fees and disconnect rule are in NV Energy Rule 15 tariff (not retrieved). Official leg.state.nv.us blocked (403); archive copies used.
Public Utilities Commission of Nevada
Interconnection ruleNRS 704.766-704.776 (net metering) and NAC 704.8812-704.8825; technical interconnection per each utility's PUCN-approved tariff (NV Energy Rule 15) – Net metering statute and regulations; utility interconnection tariff · source
Applies toUtilities = public utilities supplying electricity in Nevada (NRS 704.772): Nevada Power and Sierra Pacific Power (NV Energy). Municipal utilities and cooperatives are not public utilities under this definition.
Application formUtility net metering application plus standard net metering contract created by the utility (NAC 704.8821); interconnection must be consistent with the utility's tariff (NAC 704.882(3))
TimelinesUtility reviews complete, compliant application and sends standard net metering contract within 10 business days (or returns incomplete application with deficiencies within 10 business days); authorizes interconnection or lists deficiencies within 10 business days after completion notice and receipt of governmental final inspection/clearance (NAC 704.8823). Utility final inspection 'within a reasonable time' (NRS 704.7745).
FeesSystems <=25 kW: no fees different from the customer's rate class (except universal energy charge and statutory charges). >25 kW: customer may pay for meter capable of measuring generation and load, and required system upgrades; no standby charge.
InsuranceUtility may not require additional liability insurance (or additional standards, tests or controls) for systems meeting NEC/UL/IEEE standards and holding required permits (NRS 704.774(3)).
External disconnectStatute bars utilities from requiring 'additional controls' for compliant systems (NRS 704.774(3)(c)); any disconnect requirement comes from the utility interconnection tariff (not retrieved).
Export compensationNet billing – NRS 704.773, 704.7732, 704.775
Systems <=1 MW. Monthly netting; excess carried forward indefinitely, no payout. For <=25 kW systems applied on/after 2017-06-15, excess credited at a stepped % of the retail rate (95%, 88%, 81%, then 75% in 80 MW tranches). 20-year right to continue net metering (NRS 704.773).
Not covered by NRS 704.766-776 (utility = public utility). Rural electric cooperatives and municipal/district systems set their own net metering and interconnection policies.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Net metering <=25 kW | 25 kW | renewable net metering system <=25 kW; bidirectional meter offered; no different fees than rate class · application decision/contract within 10 business days; interconnection authorization within 10 business days after completion notice + final inspection documents · no fee or charge different from rate class (NRS 704.773(2)) |
| Net metering >25 kW to 1 MW | 1000 kW | renewable system <=1 MW; customer may be required to install generation/load meter and pay system upgrades; no standby charge · same NAC 704.8823 timelines · metering and upgrade costs at customer expense |
- NRS Chapter 704 (archive.org copy, 2026-11-09): https://web.archive.org/web/20261109060818/https://www.leg.state.nv.us/nrs/nrs-704.html (retrieved 2026-11-13)
- NAC Chapter 704 (archive.org copy, 2026-08-04): https://web.archive.org/web/20260804110508/https://www.leg.state.nv.us/NAC/NAC-704.html (retrieved 2026-11-13)
All 19 utilities in Nevada
- NV Energy933,357
- NV Energy334,961
- Valley Electric Association, Inc.22,728
- Overton Power District No 515,852
- City of Boulder City7,157
- Mt Wheeler Power, Inc.5,175
- Wells Rural Electric Company4,653
- Raft Rural Electric Cooperative Inc.1,568
- Surprise Valley Electrification6
- SCE0
- Plumas-Sierra Rural Electric Cooperative0
- City of Fallon0
- Harney Electric Cooperative, Inc.0
- Lincoln County Power District No 10
- Aha Macav Power Service0
- Alamo Power District No 30
- City of Caliente0
- WAPA-- Western Area Power Administration0
- Colorado River Comm of Nevada0
Residential customers in Nevada per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.