Home › Utilities › Nevada

Nevada

Nevada interconnection applications

19 electric utilities serve Nevada (EIA-861, 2025): 3 investor-owned utilitys, 7 electric cooperatives, 4 public power districts, 3 municipal utilitys, 1 federal power agency, 1 state power authority. Together they serve 1,325,457 residential customers; 142,497 residential customers were on net metering at year-end 2025.

Largest utilities in Nevada

NV EnergyProcess verified

Investor-owned utility · 933,357 residential customers · Nevada

Applications: PowerClerk – NV Energy Net Metering PowerClerk

Interconnection process and documents →
NV EnergyProcess verified

Investor-owned utility · 334,961 residential customers · Nevada

Applications: PowerClerk – NV Energy Net Metering PowerClerk

Interconnection process and documents →
Valley Electric Association, Inc.State guidance

Electric cooperative · 22,740 residential customers · Nevada

Interconnection process and documents →
Overton Power District No 5State guidance

Public power district · 15,852 residential customers · Nevada

Interconnection process and documents →
City of Boulder CityState guidance

Municipal utility · 7,157 residential customers · Nevada

Interconnection process and documents →
Mt Wheeler Power, Inc.State guidance

Electric cooperative · 5,387 residential customers · Nevada

Interconnection process and documents →
Wells Rural Electric CompanyState guidance

Electric cooperative · 5,161 residential customers · Nevada

Interconnection process and documents →
Raft Rural Electric Cooperative Inc.State guidance

Electric cooperative · 3,352 residential customers · Nevada

Interconnection process and documents →
Surprise Valley ElectrificationState guidance

Electric cooperative · 4,009 residential customers · Nevada

Interconnection process and documents →
SCEProcess verified

Investor-owned utility · 4,627,247 residential customers · Nevada

Applications: PowerClerk – SCE Interconnection Online Application System

Interconnection process and documents →
Plumas-Sierra Rural Electric CooperativeState guidance

Electric cooperative · 8,172 customers · Nevada

Interconnection process and documents →
City of FallonState guidance

Municipal utility · 5,012 customers · Nevada

Interconnection process and documents →

Export compensation among the researched Nevada utilities: NEM, Net billing. Rules differ by utility – see each utility page.

Nevada interconnection rule

No statewide small-generator interconnection rule with levels; technical process, fees and disconnect rule are in NV Energy Rule 15 tariff (not retrieved). Official leg.state.nv.us blocked (403); archive copies used.

Commission

Public Utilities Commission of Nevada

Interconnection rule

NRS 704.766-704.776 (net metering) and NAC 704.8812-704.8825; technical interconnection per each utility's PUCN-approved tariff (NV Energy Rule 15) – Net metering statute and regulations; utility interconnection tariff · source

Applies to

Utilities = public utilities supplying electricity in Nevada (NRS 704.772): Nevada Power and Sierra Pacific Power (NV Energy). Municipal utilities and cooperatives are not public utilities under this definition.

Application form

Utility net metering application plus standard net metering contract created by the utility (NAC 704.8821); interconnection must be consistent with the utility's tariff (NAC 704.882(3))

Timelines

Utility reviews complete, compliant application and sends standard net metering contract within 10 business days (or returns incomplete application with deficiencies within 10 business days); authorizes interconnection or lists deficiencies within 10 business days after completion notice and receipt of governmental final inspection/clearance (NAC 704.8823). Utility final inspection 'within a reasonable time' (NRS 704.7745).

Fees

Systems <=25 kW: no fees different from the customer's rate class (except universal energy charge and statutory charges). >25 kW: customer may pay for meter capable of measuring generation and load, and required system upgrades; no standby charge.

Insurance

Utility may not require additional liability insurance (or additional standards, tests or controls) for systems meeting NEC/UL/IEEE standards and holding required permits (NRS 704.774(3)).

External disconnect

Statute bars utilities from requiring 'additional controls' for compliant systems (NRS 704.774(3)(c)); any disconnect requirement comes from the utility interconnection tariff (not retrieved).

Export compensation

Net billing – NRS 704.773, 704.7732, 704.775
Systems <=1 MW. Monthly netting; excess carried forward indefinitely, no payout. For <=25 kW systems applied on/after 2017-06-15, excess credited at a stepped % of the retail rate (95%, 88%, 81%, then 75% in 80 MW tranches). 20-year right to continue net metering (NRS 704.773).

Not bound by the rule

Not covered by NRS 704.766-776 (utility = public utility). Rural electric cooperatives and municipal/district systems set their own net metering and interconnection policies.

LevelUp toCriteria / review / fee
Net metering <=25 kW25 kWrenewable net metering system <=25 kW; bidirectional meter offered; no different fees than rate class · application decision/contract within 10 business days; interconnection authorization within 10 business days after completion notice + final inspection documents · no fee or charge different from rate class (NRS 704.773(2))
Net metering >25 kW to 1 MW1000 kWrenewable system <=1 MW; customer may be required to install generation/load meter and pay system upgrades; no standby charge · same NAC 704.8823 timelines · metering and upgrade costs at customer expense
Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited