Missouri

Missouri interconnection applications

132 electric utilities serve Missouri (EIA-861, 2025): 5 investor-owned utilitys, 84 municipal utilitys, 42 electric cooperatives, 1 federal power agency. Together they serve 2,750,253 residential customers; 33,251 residential customers were on net metering at year-end 2025.

Largest utilities in Missouri

Ameren MissouriPartly researched

Investor-owned utility · 1,100,654 residential customers · Missouri

Applications: PowerClerk – Ameren Missouri PowerClerk (all applications online; paper applications on developer resources page)

Interconnection process and documents →
Evergy Missouri WestProcess verified

Investor-owned utility · 308,573 residential customers · Missouri

Applications: Own online portal – Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com

Interconnection process and documents →
Evergy (Missouri Metro / Kansas Metro)Process verified

Investor-owned utility · 523,588 residential customers · Missouri

Applications: Own online portal – Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com

Interconnection process and documents →
Liberty (Empire District)Process verified

Investor-owned utility · 161,373 residential customers · Missouri

Applications: PDF + mail – Interconnection Application/Agreement for Net Metering Systems (Rider NM)

Interconnection process and documents →
City Utilities of SpringfieldState guidance

Municipal utility · 105,859 residential customers · Missouri

Interconnection process and documents →
Cuivre River Electric Cooperative Inc.State guidance

Electric cooperative · 74,261 residential customers · Missouri

Interconnection process and documents →
City of IndependenceState guidance

Municipal utility · 54,199 residential customers · Missouri

Interconnection process and documents →
City of ColumbiaState guidance

Municipal utility · 45,899 residential customers · Missouri

Interconnection process and documents →
Southwest Electric Cooperative, Inc.State guidance

Electric cooperative · 41,670 residential customers · Missouri

Interconnection process and documents →
White River Valley El Cooperative Inc.State guidance

Electric cooperative · 39,401 residential customers · Missouri

Interconnection process and documents →
Laclede Electric Cooperative, Inc.State guidance

Electric cooperative · 35,275 residential customers · Missouri

Interconnection process and documents →
Boone Electric CooperativeState guidance

Electric cooperative · 34,098 residential customers · Missouri

Interconnection process and documents →

Export compensation among the researched Missouri utilities: NEM, Net billing. Rules differ by utility – see each utility page.

Missouri interconnection rule

Commission

Missouri Public Service Commission (PSC)

Interconnection rule

20 CSR 4240-20.065 (Net Metering) implementing RSMo §386.890 (Net Metering and Easy Connection Act) – Net Metering - interconnection standards for net metering units <=100 kW · source

Applies to

PSC rule binds PSC-regulated electrical corporations (Ameren Missouri, Evergy, Liberty/Empire). RSMo 386.890 itself binds all retail electric suppliers incl. municipal utilities (ch. 91) and rural electric cooperatives (ch. 394), whose governing bodies must adopt similar policies.

Application form

Statewide standard form 'Interconnection Application/Agreement for Net Metering Systems with Capacity of One Hundred Kilowatts (100 kW) or Less' (all-in-one document for <=10 kW per statute).

Timelines

30 days (<=10 kW) / 90 days (>10 kW) for approval; utility acts within 21 days after post-construction documentation; approval expires if not interconnected within 1 year; 15 days for unchanged system takeover.

Fees

No application fee in rule; no standby/capacity/interconnection charges beyond those of similar non-generating customers (RSMo 386.890); customer pays added metering/distribution equipment (spread over up to 12 billing cycles).

Insurance

<=10 kW: no liability insurance required. >10 kW: at least $100,000 liability insurance (personal injury incl. death and property damage), existing policy or endorsement ok.

External disconnect

Utility MAY require a switch, breaker, fuse or similar device near the meter allowing manual instant disconnection by utility worker (20.065(5)(B); RSMo 386.890); not tied to size. Unit must automatically disconnect on loss of utility service.

Export compensation

NEM – RSMo §386.890; 20 CSR 4240-20.065
Excess generation credited at least at avoided fuel cost, carried to next bill, expires after 12 months. Aggregate availability until 5% of supplier single-hour peak; supplier may stop approving once 1% of prior-year peak reached in a calendar year. Electrician/engineer certification required before interconnection.

Not bound by the rule

Municipal utilities and electric cooperatives must offer net metering under RSMo 386.890 (<=100 kW, same 30/90-day timelines, certification) and adopt similar interconnection policies/forms through their governing bodies; additional standards and insurance exemption criteria for >10 kW set by the local governing body.

LevelUp toCriteria / review / fee
<=10 kW10 kWRenewable net metering unit <=10 kW · Approve/deny within 30 days · No application fee in rule
>10 kW to 100 kW100 kWRenewable net metering unit <=100 kW · Approve/deny within 90 days · No application fee in rule

All 132 utilities in Missouri

Residential customers in Missouri per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.