Home › Utilities › Missouri › Evergy Missouri West

Investor-owned utility

Evergy Missouri West interconnection application

Evergy Missouri West is an investor-owned utility serving 308,573 residential customers in Missouri (EIA-861, 2025). Applications: Own online portal (Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com). Gridpol files Evergy Missouri West interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Evergy Missouri West’s official sources (see below). Same Evergy process as Evergy Metro, confirmed from official Evergy pages/documents (archive.org captures 2026 + ss.evergy.com). Gaps: Missouri West agreement Sections C-F content not read; review-time thresholds differ between documents.

Evergy Missouri West at a glance

Utility

Evergy Missouri West (Evergy Inc)

Type

Investor-owned utility

EIA utility ID

12698

Residential customers

308,573 (EIA-861, 2025)

Net-metered residential customers

6,002 (EIA-861, 2025)

Service territory

31 counties in Missouri

How to apply

Own online portal – Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com · official link

Who submits

Installer (contractor) or self-installing customer submits online in the customer's name; customer must be in good standing; name/address must match bill. Contact: netmeteringapp@evergy.com, 816-242-5971.

Export compensation

NEM – Evergy Missouri West Net Metering (Net Metering and Easy Connection Act)
One-for-one monthly netting; excess credited at wholesale rate, carries forward, expires after 12 months. Parallel generation alternative.

Review time (official)

Initial review 10 business days (standards: completeness notice within 10 business days). Missouri pre-approval site inspection within 30 days. Net metering technical review per Standards Rev 1.2: within 30 days for <10 kW (MO)/<15 kW (KS), within 90 days for larger (the customer information document states 30/90 business days with the size thresholds reversed). Post-installation inspection within 21 days (MO) / 15 days (KS) of installation-complete notice; meter exchange about 30 business days after post-inspection approval. Approval valid 1 year.

Documents Evergy Missouri West asks for

  • Interconnection application formOnline application in the territory-specific portal; name/address must match customer bill (else proof of association with account holder) Gridpol prepares this.
  • PV module spec sheetSpec sheet showing UL compliance (or separate compliance document)
  • Inverter spec sheetSpec sheet with UL 1741 supplement SB and IEEE 1547 compliance; must be certified grid-support utility-interactive
  • Battery spec sheet (when applicable)If batteries: spec sheet referencing UL certification (UL 1973 batteries, UL 9540 ESS)
  • Site plan / site layoutLocation of panels, inverters, current meter, AC disconnect, production meter (and storage) Gridpol prepares this.
  • Single-line diagram (one-line)Project-specific (generic manual drawings not accepted); must include production meter between AC disconnect and main service panel (Evergy wires top of meter can, customer wiring bottom); show storage, inverters, load center, DER disconnect, service meter. Self-installers may use Evergy sample diagrams Gridpol prepares this.
  • Photos (meter, main panel, equipment)Initial review: picture of the service meter. Post-installation: photos of installed panels, production meter, current meter, disconnect, batteries (if any)
  • Final inspection sign-offPassed city/county inspection report must be sent before meter exchange
  • Other utility-specific document (when applicable)Parallel Generation Supplemental Data form (Appendix C) when applying for parallel generation instead of net metering; inverter/relay settings with installation-complete notice
  • Net metering / net billing agreementSection C of the Missouri West Net Metering Interconnection Application/Agreement at application; Sections C-F uploaded at post-installation

How the Evergy Missouri West process runs

  1. Verify customer jurisdiction (Missouri Metro, Missouri West, Kansas Metro, Kansas Central) on the bill or evergy.com; customer must be in good standing.
  2. Submit online application (<200 kW: evergyder.customerapplication.com; >200 kW: evergydistributedic.customerapplication.com) with spec sheets, site plan, one-line, signed territory paperwork, service-meter photo.
  3. Initial application review (10 business days); deficiencies must be cured within 10 business days or application is withdrawn. Missouri: pre-approval site inspection within 30 days.
  4. Engineering/net metering technical review (one-line, site plan, spec sheets, transformer load, lockable disconnect); pre-approval notice by e-mail.
  5. Install within 12 months of approval; obtain city/county inspection and install required signage.
  6. Request the meter exchange/'meter set' in the application portal with post-installation photos and remaining signed agreement sections.
  7. Evergy post-installation (field design + metering) inspection (within 21 days), then net/bi-directional and production meter set (about 30 business days after post-inspection approval).
  8. Written Permission to Operate; do not energize before Evergy confirms meter exchange.

Fees

FeeApplies toNote
$0Missouri West net metering applicationno application fee (Standards Table 4-1)
$300Optional prescreening (large projects)
$81Return trip if meter exchange fails (MO)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
MO West net metering100 kW100 kW DC residential/commercial, capped at 12-month usage /8760/0.144
Parallel generation10000 kWPG-No Export / QF custom up to 10 MW
Net metering cap100 kW

System sized to lower of 100 kW DC or last-12-month usage/8,760/0.144; new construction sq ft x 7.15 kWh. Portal split at 200 kW AC.

Storage, EV and stamps

Battery storage

BESS is treated as a generator and reviewed in the same DER application; batteries UL 1973, ESS UL 9540, battery inverters UL 1741-SA/Rule 21; show batteries on one-line/site plan and include battery photos at post-installation. Under net metering a BESS may only be paired with an eligible renewable generator; BESS-only facilities are not net-metering eligible (Parallel Generation-No Export or QF program instead). BESS with critical-load panel or Tesla Powerwall cannot participate in wholesale markets.

Common issues the utility lists

  • Generic line drawings from specification manuals not accepted
  • Customer not in good standing (past due, pay arrangement, written-off bad debt)
  • Missing production meter (must sit between AC disconnect and main service panel)
  • Non-UL-certified equipment not accepted; inverters must show UL 1741 SB / IEEE 1547
  • Incomplete applications returned; deficiencies not cured within 10 business days -> withdrawn
  • Failed meter exchange/inspection: return trip fee $81 (MO)

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO