Electric cooperativeCarroll Electric Cooperative interconnection application
Carroll Electric Cooperative is an electric cooperative serving 116,791 residential customers in Arkansas, Missouri (EIA-861, 2025). Applications: Own online portal (Carroll Electric online Net Metering Application form (may also be submitted by email or mail); commercial: contact Member Services 800-432-9720). Gridpol files Carroll Electric Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Not verified: carrollecc.com blocks us; content from archive.org captures of 2024-02-23 (net-metering FAQ) and 2024-06-15 (application page), which predate Arkansas Act 278 changes. Verify on first project: current application form fields/attachments, fees, AR post-Act-278 credit terms and MO-member process.
Carroll Electric Cooperative at a glance
Carroll Electric Coop Corp (Arkansas Electric Cooperatives (G&T member))
TypeElectric cooperative
EIA utility ID3093
Residential customers116,791 (EIA-861, 2025)
Net-metered residential customers2,306 (EIA-861, 2025)
Service territory7 counties in Arkansas, 4 counties in Missouri
How to applyOwn online portal – Carroll Electric online Net Metering Application form (may also be submitted by email or mail); commercial: contact Member Services 800-432-9720 · official link
Who submitsMember submits net-metering application (online form, email or mail); commercial systems via Member Services.
Export compensationNEM – Carroll Electric Net Metering Tariff (Arkansas)
Per 2024-02 page: excess kWh accumulated and credited to the generation account, may offset other accounts under common ownership; service availability charges still apply. Arkansas Act 278 of 2023 changed terms for new systems – not reflected in capture.
Arkansas Electric Cooperative Corporation
Documents Carroll Electric Cooperative asks for
- Interconnection application formNet Metering Application – submit as soon as fully complete; incomplete applications not considered 'received' Gridpol prepares this.
- Net metering / net billing agreementNet-Metering Agreement submitted AFTER installation
- Final inspection sign-offDocumentation that all applicable local inspectors inspected and approved the facility (attached to agreement)
- Single-line diagram (one-line)Detailed electrical diagram attached to the Net-Metering Agreement Gridpol prepares this.
How the Carroll Electric Cooperative process runs
- Submit Net Metering Application (online form, email or mail) once complete.
- Carroll assesses facilities case by case; member pays any needed facility upgrades before installation.
- Install; pass all applicable local inspections.
- Submit Net-Metering Agreement with inspection documentation and detailed electrical diagram.
- Carroll safety inspection; Carroll installs bi-directional meter.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential | 25 kW | Or 100% of highest monthly usage in prior 12 months |
| Non-residential | 1000 kW | Unless otherwise approved by APSC |
| Net metering cap | 25 kW |
From 2024-02 capture (pre-Act 278 implementation) – recheck current APSC rules.
Sources
- Carroll Electric Net Metering FAQ (archive.org capture 2024-02-23): https://web.archive.org/web/20240223060154/https://carrollecc.com/net-metering (retrieved 2026-11-13)
- Carroll Electric Net Metering Application (archive.org capture 2024-06-15): https://web.archive.org/web/20240615233238/https://www.carrollecc.com/preliminary-interconnection-site-review (retrieved 2026-11-13)
Arkansas interconnection rule
Arkansas Public Service Commission
Interconnection rule126.00.23 Ark. Code R. 001 (APSC Net-Metering Rules, Rules 3.01-3.04 and Appendix A Standard Interconnection Agreement) – Net-Metering Rules · source
Applies toElectric utilities jurisdictional to the APSC (Rule 1.04.A), incl. investor-owned utilities and AECC member distribution cooperatives; rule text does not address municipal utilities
Application formStatewide Standard Interconnection Agreement for Net-Metering Facilities (Appendix A, Part I sections 1-6 + Part II terms); Appendix A-1 Preliminary Interconnection Site Review Request; Appendix A-2 Facilities Agreement
TimelinesCustomer submits Standard Interconnection Agreement at least 30 days before planned interconnection (Rule 3.01.A/C); utility responds in writing within 30 calendar days (Rule 3.01.D); modifications evaluated within 30 days (Rule 3.02.A); preliminary site review 30 days, multiple reviews 90 days (3.03.B); facilities study 120 days (3.04.G). Parallel operation only after utility inspection/approval (Appendix A).
FeesMeter charge for standard two-channel digital meter and standard one-time administrative/interconnection review fee per Commission-approved tariff (Rule 2.03.A); customer pays nonstandard metering difference (2.02.A); amounts not fixed in rule (Appendix B blanks).
InsuranceNot addressed in the rule text.
External disconnectRequired: visibly open, lockable, manual disconnect switch accessible to the utility (Rule 3.01.B; Appendix A section 4). The 2023 text contains no waiver (the 2007 version allowed a waiver for non-overridable certified inverters).
Export compensationNet billing – Ark. Code Ann. 23-18-601 et seq. (Act 278 of 2023, Cost Shifting Prevention Act); Net-Metering Rules Rule 2.04-2.08
Legacy facilities (action before 2024-09-30) keep kWh 1:1 crediting until 2040-06-01. Non-legacy: utility elects avoided-cost dollar credit for exports or net kWh with Monthly Grid Charge (Ark. Code Ann. 23-18-606/607). Avoided cost refiled by Feb 1 each year.
Cooperatives are covered (avoided cost by AECC load zone, Rule 2.08.B). Municipal utilities are not mentioned in the rule; they adopt their own net metering ordinances (e.g. North Little Rock Electric ordinance 2026).
- 126.00.23 Ark. Code R. 001 - Net-Metering Rules (LII): https://www.law.cornell.edu/regulations/arkansas/126-00-23-Ark-Code-R-001 (retrieved 2026-11-13)
- 126.03.07 Ark. Code R. 006 - prior Net Metering Rules (2007): https://www.law.cornell.edu/regulations/arkansas/126-03-07-Ark-Code-R-006 (retrieved 2026-11-13)
Other utilities in Arkansas
- Entergy Arkansas612,254
- SWEPCO109,777
- First Electric Cooperative Corporation96,685
- Ozarks Electric Cooperative Corporation74,247
- OG&E58,569
- Arkansas Valley Electric Cooperative Corporation55,000
- North Arkansas Electric Cooperative, Inc.36,595
- City of North Little Rock35,721
- City Water and Light Plant35,335
- Conway Corporation31,376
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.