Home › Utilities › Massachusetts › Unitil (Fitchburg Gas and Electric Light)
Investor-owned utilityUnitil (Fitchburg Gas and Electric Light) interconnection application
Unitil (Fitchburg Gas and Electric Light) is an investor-owned utility serving 26,409 residential customers in Massachusetts (EIA-861, 2025). Applications: PowerClerk (Unitil Interconnection Program Portal (PowerClerk by Clean Power Research, announced Feb 2025); separate Interconnection Documentation Upload Portal). Gridpol files Unitil (Fitchburg Gas and Electric Light) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. verify on first project: unitil.com blocks fetch (403) and archive.org unreachable; PowerClerk login URL, Unitil M.D.P.U. 375 simplified threshold (15/25 kW), fees, full document checklist and storage rules unconfirmed. Ask generator@unitil.com.
Unitil (Fitchburg Gas and Electric Light) at a glance
Fitchburg Gas & Elec Light Co (Unitil Corporation)
TypeInvestor-owned utility
EIA utility ID6374
Residential customers26,409 (EIA-861, 2025)
Net-metered residential customers3,958 (EIA-861, 2025)
Service territory2 counties in Massachusetts
How to applyPowerClerk – Unitil Interconnection Program Portal (PowerClerk by Clean Power Research, announced Feb 2025); separate Interconnection Documentation Upload Portal
Who submitsApplicant creates account (company profile invitation from Clean Power Research per Feb 2025 notice) in Unitil Interconnection Program Portal; installers set up company profiles. Questions: generator@unitil.com, 603-773-6480.
Export compensationNEM – Massachusetts net metering (Schedule Z) / SMART
Review time (official)DPU-approved interconnection tariff (Simplified, radial): acknowledge 3 BD, completeness 10 BD, screens 15 BD (20 BD if Screen 5 fails), total max 25 BD (30 BD); witness test within 10 BD of Certificate of Completion; Authorization to Interconnect within 5 BD after requirements and meter installation. (uniform MA tariff structure; Unitil tariff not reviewed)
Documents Unitil (Fitchburg Gas and Electric Light) asks for
- Interconnection application formMA Simplified/Expedited/Standard application per DPU interconnection tariff (M.D.P.U. 375 series) Gridpol prepares this.
- Single-line diagram (one-line)One-line diagram with application (MA tariff Exhibit A); Unitil-specific checklist not reviewed Gridpol prepares this.
- Net metering / net billing agreement (when applicable)Schedule Z required to be considered for net metering
- Final inspection sign-offCertificate of Completion signed by local municipal inspector, uploaded via Documentation Upload Portal
- Photos (meter, main panel, equipment)Post-installation photos uploaded with Certificate of Completion via Documentation Upload Portal (exact list not published)
How the Unitil (Fitchburg Gas and Electric Light) process runs
- (If new/upgraded service needed, request it first.) Installer submits Simplified Process application (Exhibit A) with supporting documents through the utility portal.
- Utility acknowledges receipt within 3 business days; completeness determination within 10 business days.
- Utility completes screens within 15 business days (20 if Screen 5 fails); total max 25 business days (30 with Screen 5 failure).
- Utility countersigns application approval line = Conditional Approval to Interconnect (minor system modifications billed if needed).
- Install facility; local municipal wiring inspector signs Certificate of Completion.
- Upload Certificate of Completion and installation photos via Unitil Documentation Upload Portal; utility may perform Witness Test within 10 business days or it is deemed waived.
- Meter installation; utility issues Authorization to Interconnect within 5 business days after requirements met and meter installed. No parallel operation before Authorization to Interconnect.
Size levels and limits
| Level | Up to | Note |
|---|
Unitil page (snippet) still cites 15 kW single-phase / 25 kW three-phase for simplified path; MA uniform tariff now 25 kW - verify Unitil tariff.
Sources
- Unitil - Apply for Interconnection (search snippet only; site returns 403 to fetch, archive.org unreachable): https://unitil.com/ways-to-save/solar-private-generation/apply-interconnection (retrieved 2026-11-13)
- Unitil - Interconnection Documentation Upload Portal (search snippet): https://unitil.com/ways-save/solar-private-generation/interconnection-documentation-upload-portal (retrieved 2026-11-13)
- Unitil - Steps to Interconnection (search snippet: photos + inspector-signed Certificate of Completion via upload portal): https://unitil.com/ways-to-save/solar-private-generation/steps-interconnection (retrieved 2026-11-13)
- Unitil - PowerClerk announcement to applicants, Feb 2025 (search snippet): https://unitil.com/sites/default/files/2025-02/Power-Clerk-Announcement-to-Applicants.pdf (retrieved 2026-11-13)
- Unitil (FG&E) M.D.P.U. 375 interconnection tariff (not fetched - 403): https://unitil.com/sites/default/files/2021-10/E_dpu375_IC_0.pdf (retrieved 2026-11-13)
- MA DPU standard interconnection tariff (Eversource version) - uniform Simplified Process: https://www.eversource.com/docs/default-source/rates-tariffs/mdpu-55a-interconnection-distributed-generation.pdf?sfvrsn=897b4555_4 (retrieved 2026-11-13)
Massachusetts interconnection rule
Massachusetts Department of Public Utilities (DPU)
Interconnection ruleDPU-approved uniform 'Standards for Interconnection of Distributed Generation' tariff of each distribution company (National Grid M.D.P.U. No. 1468; Eversource/NSTAR M.D.P.U. No. 55D; Unitil/FG&E M.D.P.U. No. 484); dockets incl. D.P.U. 19-55, D.P.U. 23-140 – Standards for Interconnection of Distributed Generation · source
Applies toThe investor-owned electric distribution companies (Eversource/NSTAR Electric, National Grid/Massachusetts Electric & Nantucket Electric, Unitil/Fitchburg Gas & Electric). Municipal light plants are not subject.
Application formUniform tariff exhibits: Exhibit A Simplified Process Interconnection Application (with Certificate of Completion attachment), Exhibit B Pre-Application Report form, Exhibit C Expedited/Standard application; Interconnection Service Agreement.
TimelinesAll time frames in Company Business Days. Simplified (radial): acknowledgement 3 BD, completeness 10 BD, screen review (20 BD if failing screen 5), conditional approval by signed application, witness test within 10 BD of Certificate of Completion or deemed waived, Authorization to Interconnect within 5 BD. Pre-Application Report required >= 250 kW, issued within 10 BD (fee $100 <250 kW, $250 250-500 kW, $750 >500 kW).
FeesSimplified $28; Expedited/Standard $4.50/kW (min $300, max $7,500) plus supplemental review/studies at cost; witness test actual cost up to $300 plus driving time (Table 6).
InsuranceNo insurance required for facilities eligible for Class I net metering (<= 60 kW) per 220 CMR 18.03(2) (company recommends adequate insurance). Otherwise general liability: $500,000 for >10-100 kW; $1M for >100 kW-1 MW; $2M/$5M aggregate for >1-5 MW; $5M for >5 MW (tariff Sec. 11.1).
External disconnectFor Listed inverters the Company MAY require an external disconnect switch (or comparable device by mutual agreement) at the PCC, accessible at all times, gang-operated, visible break, lockable open (tariff 4.2.3.1(b)).
Export compensationNEM – M.G.L. c. 164 §§ 138-140; 220 CMR 18.00 (Net Metering)
220 CMR 18.02: Class I <= 60 kW (any eligible generation); Class II > 60 kW to <= 1 MW and Class III > 1 MW to <= 2 MW (agricultural, anaerobic digestion, solar or wind). Subject to aggregate net metering caps (not re-read). Applies to distribution companies only.
Municipal light plants (about 40, e.g., WGELD) are not subject to the DPU interconnection tariff or 220 CMR 18.00 and set their own interconnection and net metering policies (some use a similar simplified application).
- National Grid M.D.P.U. No. 1468 Standards for Interconnection of Distributed Generation: https://www.nationalgridus.com/media/pdfs/billing-payments/tariffs/mae/mdpu_1468_dg_interconnection_tariff_.pdf (retrieved 2026-11-13)
- Mass.gov: Eversource EMA Simplified seminar (Feb. 2025) - not fully reviewed: https://www.mass.gov/doc/february-5-2025-eversource-ema-simplified/download (retrieved 2026-11-13)
- 220 CMR 18.02 Definitions (LII): https://www.law.cornell.edu/regulations/massachusetts/220-CMR-18-02 (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.