Iowa interconnection applications
182 electric utilities serve Iowa (EIA-861, 2025): 3 investor-owned utilitys, 42 electric cooperatives, 135 municipal utilitys, 1 public power district, 1 federal power agency. Together they serve 1,254,494 residential customers; 19,220 residential customers were on net metering at year-end 2025.
Largest utilities in Iowa
Investor-owned utility · 717,275 residential customers · Iowa
Applications: PDF + mail – State standard interconnection forms (IA/IL/SD)
Interconnection process and documents →Investor-owned utility · 419,451 residential customers · Iowa
Applications: PowerClerk – Alliant Energy Connect PowerClerk
Interconnection process and documents →Electric cooperative · 30,992 residential customers · Iowa
Interconnection process and documents →Municipal utility · 25,123 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 20,472 residential customers · Iowa
Interconnection process and documents →Municipal utility · 17,746 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 12,083 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 11,161 residential customers · Iowa
Interconnection process and documents →Municipal utility · 10,105 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 9,757 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 9,461 residential customers · Iowa
Interconnection process and documents →Electric cooperative · 8,890 residential customers · Iowa
Interconnection process and documents →Export compensation among the researched Iowa utilities: Net billing, NEM. Rules differ by utility – see each utility page.
Iowa interconnection rule
Iowa Utilities Commission (IUC, formerly Iowa Utilities Board)
Interconnection rule199 IAC Chapter 45 (199-45.1 to 45.13) – Electric Interconnection of Distributed Generation Facilities · source
Applies toElectric utilities subject to IUC rate regulation (MidAmerican Energy, Interstate Power & Light/Alliant) for DG not subject to FERC/MISO/SPP/affected-system interconnection requirements (199-45.1 'Utility', 45.2). >10 MVA starts at Level 4.
Application formCommission-approved statewide interconnection request forms and agreements posted on iuc.iowa.gov (Level 1 Interconnection Request Application form and Distributed Generation Interconnection Agreement incl. Conditional Agreement; Level 2/3/4 forms; Certificate of Completion) (199-45.4(1)); electronic submission if agreed.
TimelinesLevel 1: completeness 7 BD, screens 15 BD; approval conditioned on local electrical code approval, Certificate of Completion, witness test (completed or waived), signed Conditional Agreement within 30 BD (+15 BD extension). Level 2: completeness 10 BD, screens 20 BD. Witness test needs 15 BD notice. Preapplication report $300.
FeesCaps (199-45.4(3)): L1 $125 (+$125 witness test); L2 $250 + $1/kVA (+$125); L3 $500 + $2/kVA; L4 $1,000 + $2/kVA. Preapplication report $300.
InsuranceChapter 45 text contains no insurance requirement (terms may be in commission-approved forms; not checked).
External disconnectRequired for DG placed in service after 2015-07-01: customer-owned disconnection device easily visible and adjacent to meter (within 10 ft home/business, 30 ft multi-building; 30-72 in height), labeled; permanent placard within 10 ft of meter (199-45.3(2)).
Export compensationNet billing – Iowa Code §476.49; utility tariffs
Rate-regulated utilities file either net billing (monthly kWh credit, annual cash-out at avoided cost split with LIHEAP) or inflow-outflow billing (hourly/subhourly, credited at retail volumetric rate for 20 years until value-of-solar). Facility <=1 MW AC and <=110% of annual usage. Value-of-solar proceeding after 2027-07-01 petition or 5% statewide DG penetration.
Municipal utilities and non-rate-regulated electric cooperatives are outside 199 IAC 45 and §476.49 definitions (rate-regulated utilities only); they adopt their own interconnection and net metering/buyback policies.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Level 1 | 20 kW | Inverter-based, lab-certified, <=20 kVA, no utility construction · Completeness 7 BD (10 BD cure); screens 15 BD after complete · max $125 + up to $125 witness test |
| Level 2 | 2000 kW | Lab-certified, radial or single-customer spot network; non-inverter <=2 MVA; inverter by voltage table (<5 kV <500 kVA; 5-15 kV <2 MVA (<3 MVA mainline near sub); up to <5 MVA at 30-69 kV) · Completeness 10 BD; screens 20 BD after complete · max $250 + $1/kVA + up to $125 witness test |
| Level 3 | Non-exporting to area networks (<=50 kVA) or radial circuits · max $500 + $2/kVA | |
| Level 4 | 10000 kW | <=10 MVA, not all equipment lab-certified or failing lower levels; studies · max $1,000 + $2/kVA plus study costs |
- 199 IAC ch. 45: https://www.legis.iowa.gov/docs/iac/chapter/199.45.pdf (retrieved 2026-11-13)
- Iowa Code §476.49: https://www.legis.iowa.gov/docs/code/476.49.pdf (retrieved 2026-11-13)
All 182 utilities in Iowa
- MidAmerican Energy639,558
- Alliant Energy (Iowa)419,451
- Corridor Energy Cooperative30,992
- City of Ames25,123
- Eastern Iowa Light & Power Cooperative20,472
- Cedar Falls Utilities17,746
- Midland Power Cooperative12,083
- Maquoketa Valley Rrl Electric Cooperative11,161
- Board of Water Electric & Communications10,105
- Iowa Lakes Electric Cooperative9,757
- North West Rural Electric Cooperative9,461
- Access Energy Cooperative8,890
- East-Central Iowa Rural Electric Cooperative7,417
- Consumers Energy Cooperative7,121
- MiEnergy Cooperative6,023
- Heartland Power Cooperative4,357
- Butler County Rural Electric Cooperative3,903
- Prairie Energy Cooperative3,433
- City of Maquoketa2,804
- City of Independence2,737
- Amana Society Service Company709
- City of Coon Rapids630
- City of Preston502
- Federated Rural Electric Association53
- Freeborn Mower Electric Cooperative6
- OPPD0
- United Electric Cooperative, Inc.0
- Allamakee-Clayton El Cooperative, Inc.0
- Nobles Cooperative Electric0
- Grundy Electric Cooperative, Inc.0
- Indianola Municipal Utilities0
- T I P Rural Electric Cooperative0
- Chariton Valley Electric Cooperative, Inc.0
- City of Spencer0
- Southwest Iowa Rural Electric Cooperative0
- Clarke Electric Cooperative Inc.0
- Western Iowa Power Cooperative0
- City of Pella0
- Waverly Municipal Electric Utility0
- Farmers Electric Cooperative, Inc.0
- Guthrie County Rural E C A0
- Southern Iowa Electric Cooperative, Inc.0
- Atlantic Municipal Utilities (IA)0
- City of Webster City0
- City of Mt Pleasant0
- Harrison County Rrl Electric Cooperative0
- Atchison-Holt Electric Cooperative0
- City of Algona0
- Nishnabotna Valley R E C0
- Woodbury County Rural E C A0
- City of Estherville0
- City of Onawa0
- City of Denison0
- Pella Cooperative Electric Association0
- Eldridge City Utilities0
- City of Sioux Center0
- Harlan Municipal Utilities0
- City of Winterset0
- Raccoon Valley Electric Cooperative0
- City of Vinton0
- City of New Hampton0
- City of Orange City0
- City of Osage0
- Lyon Rural Electric Cooperative0
- Grundy County Rural Electric Cooperative0
- City of Sergeant Bluff0
- City of Forest City0
- City of Story City0
- Franklin Rural Electric Cooperative0
- City of Tipton0
- Calhoun County Electric Cooperative Association0
- City of Milford0
- City of Bellevue0
- City of West Liberty0
- City of Carlisle0
- Grundy Center Mun Light & Power0
- City of Wilton0
- City of Guttenberg0
- City of Sibley0
- Rock Rapids Municipal Utility0
- City of Pocahontas0
- City of Bloomfield0
- City of Lake View0
- City of Hawarden0
- Osceola Electric Cooperative, Inc.0
- New London Municipal Utilities0
- City of Lake Mills0
- City of Lamoni0
- La Porte City Utilities0
- Cascade Municipal Utilities0
- City of Greenfield0
- City of Ogden0
- City of Sumner0
- City of Corning0
- City of Traer0
- City of State Center0
- City of Alta0
- City of Stuart0
- City of Hartley0
- City of Durant0
- City of Denver0
- City of Montezuma0
- City of Woodbine0
- City of Remsen0
- West Point Utility System0
- City of Akron0
- City of Brooklyn0
- City of Manning0
- City of Laurens0
- City of Sanborn0
- City of Mapleton0
- City of Lenox0
- City of Panora0
- City of Villisca0
- City of Strawberry Point0
- City of Glidden0
- City of Dysart0
- City of Lake Park0
- City of Paullina0
- Farmers Electric Cooperative0
- Keosauqua Municipal Light & Power0
- City of McGregor0
- Bancroft Municipal Utilities0
- City of West Bend0
- City of Anita0
- Gowrie Municipal Utilities0
- City of Alton0
- City of Fairbank0
- City of Primghar0
- City of Aplington0
- City of Fredericksburg0
- City of Dayton0
- City of Wall Lake0
- City of Aurelia0
- City of Larchwood0
- City of Graettinger0
- City of Afton0
- City of Dike0
- Town of Manilla0
- City of Neola0
- City of Rockford0
- City of Buffalo0
- City of Fontanelle0
- City of Grand Junction0
- City of Danville0
- City of Earlville0
- City of Hinton0
- City of Readlyn0
- City of Stratford0
- City of Sabula0
- City of Hopkinton0
- City of Anthon0
- City of Fonda0
- City of Stanton0
- City of Shelby0
- City of Coggon0
- City of Whittemore0
- City of Breda0
- City of Lawler0
- City of Burt0
- City of Farnhamville0
- City of Ellsworth0
- City of Renwick0
- City of Stanhope0
- City of Lehigh0
- WAPA-- Western Area Power Administration0
- City of Long Grove0
- City of Livermore0
- City of Orient0
- City of Callender0
- City of Kimballton0
- City of Corwith0
- City of Marathon0
- City of Auburn0
- City of Alta Vista0
- Grafton Electric0
- Pleasant Hill Community Line0
- City of Paton0
- City of Woolstock0
- Boone Valley Electric Cooperative0
- Cass Electric Cooperative0
- Town of Westfield0
Residential customers in Iowa per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.