Home › Utilities › Iowa › Amana Society Service Company

Investor-owned utility

Amana Society Service Company interconnection application

Amana Society Service Company is an investor-owned utility serving 709 residential customers in Iowa (EIA-861, 2025). Gridpol files Amana Society Service Company interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Partly researched from official sources. verify on first project: no Amana Society Service Co interconnection page found online; confirm forms, fee, net metering tariff with utility.

Amana Society Service Company at a glance

Utility

Amana Society Service Co

Type

Investor-owned utility

EIA utility ID

471

Residential customers

709 (EIA-861, 2025)

Net-metered residential customers

none reported

Service territory

1 county in Iowa

Who submits

Iowa rules: applicants use Iowa Utilities Commission-approved standard interconnection request forms and agreements; utility-specific channel not found online.

Review time (official)

Per 199 IAC 45.

Documents Amana Society Service Company asks for

  • Interconnection application formIUC standard Level 1 (≤20 kVA) or Level 2-4 interconnection request Gridpol prepares this.
  • Single-line diagram (one-line)One-line diagram (Iowa standard form) Gridpol prepares this.
  • Site plan / site layoutPlot plan Gridpol prepares this.
  • Inverter spec sheetManufacturer specs + NRTL label info
  • Proof of insuranceProof of homeowner's/general liability insurance
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.

How the Amana Society Service Company process runs

  1. Obtain IUC standard form
  2. Submit to utility with fee and attachments
  3. Review per 199 IAC 45
  4. Interconnection agreement
  5. Install, inspection, witness test
  6. Certificate of Completion / operate

Fees

FeeApplies toNote
$125Level 1 (Iowa standard form)witness test up to $125 (199 IAC 45.5(10)); confirm utility applies it

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 120 kWkVA, 199 IAC 45
Level 2-410000 kW

Sources

Iowa interconnection rule

Commission

Iowa Utilities Commission (IUC, formerly Iowa Utilities Board)

Interconnection rule

199 IAC Chapter 45 (199-45.1 to 45.13) – Electric Interconnection of Distributed Generation Facilities · source

Applies to

Electric utilities subject to IUC rate regulation (MidAmerican Energy, Interstate Power & Light/Alliant) for DG not subject to FERC/MISO/SPP/affected-system interconnection requirements (199-45.1 'Utility', 45.2). >10 MVA starts at Level 4.

Application form

Commission-approved statewide interconnection request forms and agreements posted on iuc.iowa.gov (Level 1 Interconnection Request Application form and Distributed Generation Interconnection Agreement incl. Conditional Agreement; Level 2/3/4 forms; Certificate of Completion) (199-45.4(1)); electronic submission if agreed.

Timelines

Level 1: completeness 7 BD, screens 15 BD; approval conditioned on local electrical code approval, Certificate of Completion, witness test (completed or waived), signed Conditional Agreement within 30 BD (+15 BD extension). Level 2: completeness 10 BD, screens 20 BD. Witness test needs 15 BD notice. Preapplication report $300.

Fees

Caps (199-45.4(3)): L1 $125 (+$125 witness test); L2 $250 + $1/kVA (+$125); L3 $500 + $2/kVA; L4 $1,000 + $2/kVA. Preapplication report $300.

Insurance

Chapter 45 text contains no insurance requirement (terms may be in commission-approved forms; not checked).

External disconnect

Required for DG placed in service after 2015-07-01: customer-owned disconnection device easily visible and adjacent to meter (within 10 ft home/business, 30 ft multi-building; 30-72 in height), labeled; permanent placard within 10 ft of meter (199-45.3(2)).

Export compensation

Net billing – Iowa Code §476.49; utility tariffs
Rate-regulated utilities file either net billing (monthly kWh credit, annual cash-out at avoided cost split with LIHEAP) or inflow-outflow billing (hourly/subhourly, credited at retail volumetric rate for 20 years until value-of-solar). Facility <=1 MW AC and <=110% of annual usage. Value-of-solar proceeding after 2027-07-01 petition or 5% statewide DG penetration.

Not bound by the rule

Municipal utilities and non-rate-regulated electric cooperatives are outside 199 IAC 45 and §476.49 definitions (rate-regulated utilities only); they adopt their own interconnection and net metering/buyback policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited