Home › Utilities › Arkansas

Arkansas

Arkansas interconnection applications

36 electric utilities serve Arkansas (EIA-861, 2025): 4 investor-owned utilitys, 17 electric cooperatives, 15 municipal utilitys. Together they serve 1,465,282 residential customers; 19,458 residential customers were on net metering at year-end 2025.

Largest utilities in Arkansas

Entergy ArkansasProcess verified

Investor-owned utility · 612,255 residential customers · Arkansas

Applications: PDF + email – Preliminary Interconnection Site Review Request + Standard Interconnection Agreement for Net-Metering Facilities (PDF forms; email NetMetering-Arkansas@entergy.com or mail Customer Service Net-Metering, P.O. Box 551, Little Rock, AR 72203)

Interconnection process and documents →
SWEPCOProcess verified

Investor-owned utility · 473,880 residential customers · Arkansas

Applications: PowerClerk – AEP PowerClerk (DER interconnection application; register account first)

Interconnection process and documents →
Carroll Electric CooperativePartly researched

Electric cooperative · 116,791 residential customers · Arkansas

Applications: Own online portal – Carroll Electric online Net Metering Application form (may also be submitted by email or mail); commercial: contact Member Services 800-432-9720

Interconnection process and documents →
First Electric Cooperative CorporationState rule applies

Electric cooperative · 96,685 residential customers · Arkansas

Interconnection process and documents →
Ozarks Electric Cooperative CorporationState rule applies

Electric cooperative · 86,120 residential customers · Arkansas

Interconnection process and documents →
OG&EProcess verified

Investor-owned utility · 774,864 residential customers · Arkansas

Applications: PowerClerk – OG&E PowerClerk

Interconnection process and documents →
Arkansas Valley Electric Cooperative CorporationState rule applies

Electric cooperative · 59,272 residential customers · Arkansas

Interconnection process and documents →
North Arkansas Electric Cooperative, Inc.State rule applies

Electric cooperative · 36,595 residential customers · Arkansas

Interconnection process and documents →
City of North Little RockState guidance

Municipal utility · 35,721 residential customers · Arkansas

Interconnection process and documents →
City Water and Light PlantState guidance

Municipal utility · 35,335 residential customers · Arkansas

Interconnection process and documents →
Conway CorporationState guidance

Municipal utility · 31,376 residential customers · Arkansas

Interconnection process and documents →
Craighead Electric Cooperative CorporationState rule applies

Electric cooperative · 25,180 residential customers · Arkansas

Interconnection process and documents →

Export compensation among the researched Arkansas utilities: Net billing, NEM. Rules differ by utility – see each utility page.

Arkansas interconnection rule

Commission

Arkansas Public Service Commission

Interconnection rule

126.00.23 Ark. Code R. 001 (APSC Net-Metering Rules, Rules 3.01-3.04 and Appendix A Standard Interconnection Agreement) – Net-Metering Rules · source

Applies to

Electric utilities jurisdictional to the APSC (Rule 1.04.A), incl. investor-owned utilities and AECC member distribution cooperatives; rule text does not address municipal utilities

Application form

Statewide Standard Interconnection Agreement for Net-Metering Facilities (Appendix A, Part I sections 1-6 + Part II terms); Appendix A-1 Preliminary Interconnection Site Review Request; Appendix A-2 Facilities Agreement

Timelines

Customer submits Standard Interconnection Agreement at least 30 days before planned interconnection (Rule 3.01.A/C); utility responds in writing within 30 calendar days (Rule 3.01.D); modifications evaluated within 30 days (Rule 3.02.A); preliminary site review 30 days, multiple reviews 90 days (3.03.B); facilities study 120 days (3.04.G). Parallel operation only after utility inspection/approval (Appendix A).

Fees

Meter charge for standard two-channel digital meter and standard one-time administrative/interconnection review fee per Commission-approved tariff (Rule 2.03.A); customer pays nonstandard metering difference (2.02.A); amounts not fixed in rule (Appendix B blanks).

Insurance

Not addressed in the rule text.

External disconnect

Required: visibly open, lockable, manual disconnect switch accessible to the utility (Rule 3.01.B; Appendix A section 4). The 2023 text contains no waiver (the 2007 version allowed a waiver for non-overridable certified inverters).

Export compensation

Net billing – Ark. Code Ann. 23-18-601 et seq. (Act 278 of 2023, Cost Shifting Prevention Act); Net-Metering Rules Rule 2.04-2.08
Legacy facilities (action before 2024-09-30) keep kWh 1:1 crediting until 2040-06-01. Non-legacy: utility elects avoided-cost dollar credit for exports or net kWh with Monthly Grid Charge (Ark. Code Ann. 23-18-606/607). Avoided cost refiled by Feb 1 each year.

Not bound by the rule

Cooperatives are covered (avoided cost by AECC load zone, Rule 2.08.B). Municipal utilities are not mentioned in the rule; they adopt their own net metering ordinances (e.g. North Little Rock Electric ordinance 2026).

LevelUp toCriteria / review / fee
Standard net-metering interconnection (single track)No kW tiers; facility size limited to lesser of statutory nameplate limit and customer's highest monthly usage converted to average output (Rule 1.04.D) · 30 calendar days utility written response (Rule 3.01.D) · Standard one-time administrative/interconnection review fee per utility tariff (amount not set in rule)
Preliminary site review / Facilities Study (when needed)Utility may require preliminary interconnection site review and facilities study · Preliminary review 30 days (90 days for parallel multiple reviews); facilities study within 120 days (Rules 3.03.B, 3.04.G) · Actual cost of preliminary review; facilities study deposit (Rules 3.03.C, 3.04.C)
Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited