Municipal utilitySalem City Corporation interconnection application
Salem City Corporation is a municipal utility serving 4,051 customers in Utah (EIA-861, 2025). Gridpol files Salem City Corporation interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Utah’s commission rule (Utah Admin. Code R746-312 (Electrical Interconnection)) does not bind municipal utilitys; Salem City Corporation sets its own interconnection policy. We confirm its form on the first project. Distribution electrical cooperatives fall under Utah Code 54-15 with their board of directors as governing authority (sets credits, extra requirements). Municipal utilities are not electrical corporations under 54-15 and set their own policies.
Salem City Corporation at a glance
Salem City Corporation
TypeMunicipal utility
EIA utility ID16557
Customers4,051 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in Utah
Documents Salem City Corporation asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Salem City Corporation. We confirm Salem City Corporation’s exact list on the first project.
Utah interconnection rule
Public Service Commission of Utah
Interconnection ruleUtah Admin. Code R746-312 (Electrical Interconnection) – Electrical Interconnection · source
Applies toPublic utilities providing electric service (Rocky Mountain Power). Rule also defines governing authority for distribution electrical cooperatives (board of directors) for net metering interconnections; fee limits apply to commission-regulated utilities, other utilities may set reasonable fees. Municipal utilities not covered.
Application formStandard form application/interconnection agreement based on FERC SGIP forms, modified to match the rule (R746-312-2 'standard form')
TimelinesDate/time stamp on receipt; acknowledgment 3 business days; completeness 10 business days (10 business days to cure); Level 1/2 screens 15 business days after completeness; Level 1 deemed approved if no notice within 25 business days of receipt; final authorization/inspection within 10 business days of documentation, otherwise witness test waived.
FeesLevel 1: none. Level 2: <=$50 + $1/kW. Level 3: <=$100 + $2/kW + study costs; engineering <=$100/h (annual CPI adjustment).
InsuranceFor net metering customers meeting Utah Code 54-15-106 standards, the utility may not require additional tests or additional liability insurance.
Export compensationNet billing – Utah Code Title 54, Chapter 15 (54-15-102 to -106)
Customer generation system 1.2-25 kW residential, <=2 MW non-residential (inverter-controlled). Excess credited at least at avoided cost or as set by governing authority (PSC/co-op board); unused credits expire at end of annualized billing period (April-March) and go to low-income programs. Rocky Mountain Power uses a PSC-set export credit (cost-benefit determination under 54-15-105.1). Utilities may close program at 0.1% of 2007 peak or if <1,000 customers.
Distribution electrical cooperatives fall under Utah Code 54-15 with their board of directors as governing authority (sets credits, extra requirements). Municipal utilities are not electrical corporations under 54-15 and set their own policies.
- R746-312-8 Level 1: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-8 (retrieved 2026-11-13)
- R746-312-9 Level 2: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-9 (retrieved 2026-11-13)
- R746-312-13 Fees: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-13 (retrieved 2026-11-13)
- R746-312-2 Definitions: https://www.law.cornell.edu/regulations/utah/Utah-Admin-Code-R746-312-2 (retrieved 2026-11-13)
- Utah Code 54-15-102 Definitions: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S102.html (retrieved 2026-11-13)
- Utah Code 54-15-104 Credits: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S104.html (retrieved 2026-11-13)
- Utah Code 54-15-106 Requirements/insurance: https://le.utah.gov/xcode/Title54/Chapter15/54-15-S106.html (retrieved 2026-11-13)
Other utilities in Utah
- Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)969,037
- Provo City Power36,032
- City of St George28,681
- Dixie Escalante R E A, Inc.28,410
- Lehi City Corporation28,051
- City of Logan19,879
- City of Murray17,724
- Spanish Fork City Corporation16,588
- City of Bountiful15,762
- Heber Light & Power Company13,903
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.