Electric cooperativeBerkeley Electric Cooperative (BEC) interconnection application
Berkeley Electric Cooperative (BEC) is an electric cooperative serving 119,545 residential customers in South Carolina (EIA-861, 2025). Applications: Own online portal (BEC online interconnection form (FormAssembly via SmartHub, linked from BEC Solar Energy page)). Gridpol files Berkeley Electric Cooperative (BEC) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Berkeley Electric Cooperative (BEC)’s official sources (see below). Process, fees and documents from BEC Solar Energy page. Not verified: battery/storage rules, BEC 500 kVA interconnection standard details.
Berkeley Electric Cooperative (BEC) at a glance
Berkeley Electric Coop Inc
TypeElectric cooperative
EIA utility ID1613
Residential customers119,545 (EIA-861, 2025)
Net-metered residential customers1,983 (EIA-861, 2025)
Service territory3 counties in South Carolina
How to applyOwn online portal – BEC online interconnection form (FormAssembly via SmartHub, linked from BEC Solar Energy page) · official link
Who submitsMember signs the Interconnection Application; BEC notifies the solar company of application status. Contacts: Tameka Palmer tamekap@bec.coop (843) 899-8433.
Export compensationNet billing – Renewable Generation Surplus Rider
All new installations: surplus kWh credited at $0.0603/kWh; available only on non-demand, non-time-of-day rates (Residential RS, GS <100 kVA). Legacy Net Metering rider: bank reset to zero each June 1.
BEC reviews for completeness and notifies solar company; typically about two weeks after the building codes release for bi-directional meter installation.
Wholesale supplier / associationCentral Electric Power Cooperative, Inc. (SC)
Documents Berkeley Electric Cooperative (BEC) asks for
- Interconnection application formInterconnection Application, fully completed, signed and dated (same info also to local Building Inspector's office) Gridpol prepares this.
- Customer signatureMember signature
- Proof of insuranceHomeowners insurance declaration/policy
- Other utility-specific documentSales contract with total price and monthly kWh production estimate
- Single-line diagram (one-line)One-line electrical drawing Gridpol prepares this.
- Final inspection sign-offCity/county Building & Codes inspection; inspector notifies BEC of release
How the Berkeley Electric Cooperative (BEC) process runs
- Optional: BEC evaluation of projected solar value.
- Submit online interconnection form (signed application, homeowner insurance, sales contract with production estimate, one-line drawing) and pay $150 fee.
- BEC reviews for completeness and notifies solar company of status.
- Install - connect in member's breaker panel, never in BEC meter base.
- City/county Building & Codes inspection; inspector notifies BEC of release. Leave PV breaker ON and outdoor disconnect OPEN.
- BEC metering inspection and bi-directional meter installation (typically ~2 weeks after release); solar company or member notified; energize only after meter is installed.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $150 | All solar interconnection applications (one-time) | Must be paid before application is processed |
| $50 | Field inspection, per inspection | |
| up to $1,000 | Unauthorized meter tampering (contractor entering BEC meter base) | Penalty |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential (Renewable Surplus Rider) | 20 kW | Up to max monthly kW use, <=20 kW AC |
| Small Commercial (<100 kVA transformer, non-demand) | 100 kW | |
| Net metering cap | 20 kW |
Size limited (wholesale power agreement) to annual kWh / 1,800 for kW AC, or average monthly kWh / 150. Large accounts >100 kVA may self-consume larger systems with no surplus value.
Common issues the utility lists
- Application processed only after $150 fee is paid and form is fully completed, signed and dated
- Connection inside BEC meter base (up to $1,000 tampering charge)
- System sized above usage-based limit
Gridpol’s pre-submission check covers these before we file.
Sources
- Berkeley Electric Cooperative - Solar Energy / Step-by-Step Guide: https://berkeleyelectric.coop/renewable-energy (retrieved 2026-11-13)
- BEC Standard for Interconnecting Distributed Resources Up to 500 kVA: https://www.berkeleyelectric.coop/sites/default/files/documents/0421%20Standard%20for%20Interconnecting%20Distributed%20Resources%20Up%20to%20500%20KVA.pdf (retrieved 2026-11-13)
Other utilities in South Carolina
- Dominion Energy South Carolina (DESC)712,679
- Duke Energy Carolinas (DEC)582,062
- Santee Cooper188,962
- Duke Energy Progress (DEP)143,884
- Horry Electric Cooperative Inc.91,545
- Palmetto Electric Cooperative Inc.69,848
- Blue Ridge Electric Cooperative Inc.68,647
- York Electric Cooperative Inc.66,369
- Laurens Electric Cooperative, Inc.59,786
- Mid-Carolina Electric Cooperative Inc.57,067
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.