Home › Utilities › North Carolina › Town of Pinetops
Municipal utilityTown of Pinetops interconnection application
Town of Pinetops is a municipal utility serving 704 customers in North Carolina (EIA-861, 2025). Gridpol files Town of Pinetops interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
North Carolina’s commission rule (North Carolina Interconnection Procedures, Forms, and Agreements for State-Jurisdictional Generator Interconnections (NCIP), NCUC Docket No. E-100, Sub 101) does not bind municipal utilitys; Town of Pinetops sets its own interconnection policy. We confirm its form on the first project. EMCs and municipal utilities are not rate-regulated by NCUC and are not required to offer net metering; they set their own interconnection procedures (many munis/ElectriCities members and EMCs use procedures modeled on the NCIP 20 kW / Fast Track structure).
Town of Pinetops at a glance
Town of Pinetops
TypeMunicipal utility
EIA utility ID15058
Customers704 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in North Carolina
Wholesale supplier / associationElectriCities of North Carolina (NCMPA1 + NCEMPA + non-power-agency and associate members)
Documents Town of Pinetops asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for Town of Pinetops. We confirm Town of Pinetops’s exact list on the first project.
North Carolina interconnection rule
North Carolina Utilities Commission (NCUC)
Interconnection ruleNorth Carolina Interconnection Procedures, Forms, and Agreements for State-Jurisdictional Generator Interconnections (NCIP), NCUC Docket No. E-100, Sub 101 – North Carolina Interconnection Procedures, Forms, and Agreements · source
Applies toState-jurisdictional interconnections to NCUC-regulated utilities (Duke Energy Carolinas, Duke Energy Progress, Dominion Energy North Carolina) where the output is not sold to a third party (NCIP 1.1.1). EMCs and municipal utilities are not rate-regulated by NCUC for this.
Application formStatewide NCIP forms: Attachment 6 Interconnection Request Application Form for Certified Inverter-Based Generating Facility No Larger than 20 kW (with Certificate of Completion); Attachment 2 Interconnection Request Application Form for all others; standard Interconnection Agreement.
Timelines20 kW process: screens and approval within 15 business days; minor construction cost estimate within 15 business days; Certificate of Completion after installation, utility may witness test before parallel operation; no parallel operation until witness test performed or waived. Fast Track initial review 15 business days after complete request. Pre-Application Report $500.
Fees<= 20 kW: $200 processing fee; Fast Track $750 (20-100 kW) / $1,000 (100 kW-2 MW); Supplemental Review deposit $750/$1,000; Study deposit from $20,000 + $1/kWac; Pre-Application Report $500.
InsuranceLiability insurance required (NCIP 6.15): residential <= 250 kW standard homeowner's policy with >= $100,000 per occurrence; non-residential <= 250 kW CGL >= $300,000; non-residential > 250 kW CGL >= $1,000,000; self-insurance possible for creditworthy customers.
External disconnectUtility MAY require a manual load-break disconnect or safety switch with visible position, padlockable open, accessible, labeled 'Generator Disconnect Switch'; if required by the utility (not by code) for certified inverters <= 10 kW, the utility reimburses reasonable installation cost (NCIP 2.1, 6.16).
Export compensationNet billing – G.S. 62-126.4 (S.L. 2017-192, HB 589); NCUC Order Approving Revised Net Metering Tariffs, Docket E-100, Sub 180 (Mar. 23, 2023)
Duke: since Oct. 1, 2023 new residential customers take Rider RSC (TOU-CPP, minimum bill, monthly net excess credited at avoided cost) or capped Rider NMB (bridge, up to 15 years); legacy Rider NM closed Sept. 30, 2023, existing residential move to NMB after Dec. 31, 2026. Public Staff states eligibility 1 MW AC non-residential, 20 kW AC residential (as published). Dominion NC terms not reviewed.
EMCs and municipal utilities are not rate-regulated by NCUC and are not required to offer net metering; they set their own interconnection procedures (many munis/ElectriCities members and EMCs use procedures modeled on the NCIP 20 kW / Fast Track structure).
- NC Interconnection Procedures, Forms, and Agreements eff. Oct. 11, 2021 (Docket E-100 Sub 101), Dominion-hosted copy: https://cdn-dominionenergy-prd-001.azureedge.net/-/media/content/large-business-services/pdfs/north-carolina/large-business/parallel-generation-and-interconnection/pdfs/north-carolina-interconnection-procedures-eff.pdf (retrieved 2026-11-13)
- NC Public Staff - Net Metering: https://publicstaff.nc.gov/electric/net-metering (retrieved 2026-11-13)
Other utilities in North Carolina
- Duke Energy Carolinas (DEC)1,961,108
- Duke Energy Progress (DEP)1,383,941
- EnergyUnited124,446
- Dominion Energy Virginia / Dominion Energy North Carolina109,057
- Brunswick Electric Member Corporation108,087
- Union Electric Membership Corporation86,852
- Jones-Onslow Electric Member Corporation81,070
- Fayetteville Public Works Commission75,618
- Blue Ridge Electric Member Corporation72,320
- Rutherford Electric Member Corporation72,060
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.