New River Light & Power Company interconnection application

New River Light & Power Company is a state power authority serving 7,318 residential customers in North Carolina (EIA-861, 2025). Gridpol files New River Light & Power Company interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

North Carolina’s commission rule (North Carolina Interconnection Procedures, Forms, and Agreements for State-Jurisdictional Generator Interconnections (NCIP), NCUC Docket No. E-100, Sub 101) does not bind state power authoritys; New River Light & Power Company sets its own interconnection policy. We confirm its form on the first project. EMCs and municipal utilities are not rate-regulated by NCUC and are not required to offer net metering; they set their own interconnection procedures (many munis/ElectriCities members and EMCs use procedures modeled on the NCIP 20 kW / Fast Track structure).

New River Light & Power Company at a glance

Utility

New River Light & Power Co

Type

State power authority

EIA utility ID

13482

Residential customers

7,318 (EIA-861, 2025)

Net-metered residential customers

14 (EIA-861, 2025)

Service territory

1 county in North Carolina

Wholesale supplier / association

ElectriCities of North Carolina (NCMPA1 + NCEMPA + non-power-agency and associate members)

Documents New River Light & Power Company asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for New River Light & Power Company. We confirm New River Light & Power Company’s exact list on the first project.

North Carolina interconnection rule

Commission

North Carolina Utilities Commission (NCUC)

Interconnection rule

North Carolina Interconnection Procedures, Forms, and Agreements for State-Jurisdictional Generator Interconnections (NCIP), NCUC Docket No. E-100, Sub 101 – North Carolina Interconnection Procedures, Forms, and Agreements · source

Applies to

State-jurisdictional interconnections to NCUC-regulated utilities (Duke Energy Carolinas, Duke Energy Progress, Dominion Energy North Carolina) where the output is not sold to a third party (NCIP 1.1.1). EMCs and municipal utilities are not rate-regulated by NCUC for this.

Application form

Statewide NCIP forms: Attachment 6 Interconnection Request Application Form for Certified Inverter-Based Generating Facility No Larger than 20 kW (with Certificate of Completion); Attachment 2 Interconnection Request Application Form for all others; standard Interconnection Agreement.

Timelines

20 kW process: screens and approval within 15 business days; minor construction cost estimate within 15 business days; Certificate of Completion after installation, utility may witness test before parallel operation; no parallel operation until witness test performed or waived. Fast Track initial review 15 business days after complete request. Pre-Application Report $500.

Fees

<= 20 kW: $200 processing fee; Fast Track $750 (20-100 kW) / $1,000 (100 kW-2 MW); Supplemental Review deposit $750/$1,000; Study deposit from $20,000 + $1/kWac; Pre-Application Report $500.

Insurance

Liability insurance required (NCIP 6.15): residential <= 250 kW standard homeowner's policy with >= $100,000 per occurrence; non-residential <= 250 kW CGL >= $300,000; non-residential > 250 kW CGL >= $1,000,000; self-insurance possible for creditworthy customers.

External disconnect

Utility MAY require a manual load-break disconnect or safety switch with visible position, padlockable open, accessible, labeled 'Generator Disconnect Switch'; if required by the utility (not by code) for certified inverters <= 10 kW, the utility reimburses reasonable installation cost (NCIP 2.1, 6.16).

Export compensation

Net billing – G.S. 62-126.4 (S.L. 2017-192, HB 589); NCUC Order Approving Revised Net Metering Tariffs, Docket E-100, Sub 180 (Mar. 23, 2023)
Duke: since Oct. 1, 2023 new residential customers take Rider RSC (TOU-CPP, minimum bill, monthly net excess credited at avoided cost) or capped Rider NMB (bridge, up to 15 years); legacy Rider NM closed Sept. 30, 2023, existing residential move to NMB after Dec. 31, 2026. Public Staff states eligibility 1 MW AC non-residential, 20 kW AC residential (as published). Dominion NC terms not reviewed.

Not bound by the rule

EMCs and municipal utilities are not rate-regulated by NCUC and are not required to offer net metering; they set their own interconnection procedures (many munis/ElectriCities members and EMCs use procedures modeled on the NCIP 20 kW / Fast Track structure).

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.