Home › Utilities › New Jersey › Rockland Electric (O&R New Jersey)

Investor-owned utility

Rockland Electric (O&R New Jersey) interconnection application

Rockland Electric (O&R New Jersey) is an investor-owned utility serving 66,678 residential customers in New Jersey (EIA-861, 2025). Applications: PowerClerk (RECO DG Interconnection PowerClerk). Gridpol files Rockland Electric (O&R New Jersey) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Rockland Electric (O&R New Jersey)’s official sources (see below). NJ regulatory timelines not restated.

Rockland Electric (O&R New Jersey) at a glance

Utility

Rockland Electric Co (Consolidated Edison Inc)

Type

Investor-owned utility

EIA utility ID

16213

Residential customers

66,678 (EIA-861, 2025)

Net-metered residential customers

1,654 (EIA-861, 2025)

Service territory

3 counties in New Jersey

How to apply

PowerClerk – RECO DG Interconnection PowerClerk · official link

Who submits

Customer or agent; agent must upload customer letter of authorization.

Export compensation

NEM – New Jersey net metering (N.J.A.C. 14:8-4)

Documents Rockland Electric (O&R New Jersey) asks for

  • Interconnection application formApplication/Agreement Gridpol prepares this.
  • Three-line diagramthree-line electrical schematic Gridpol prepares this.
  • Letter of authorization / designated agent form (when applicable)if applicant is agent
  • Inverter spec sheetmanufacturer data sheet
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • Other utility-specific documentmanufacturer verification test procedures (contractor certification)
  • UL 1741 / IEEE 1547 certificationUL1741SB compliance certificate
  • Battery spec sheet (when applicable)Energy Storage Supplemental Form
  • Final inspection sign-offInterconnection Agreement Part 2 / Certificate of Completion

How the Rockland Electric (O&R New Jersey) process runs

  1. Upload application and documents in PowerClerk
  2. Utility reviews application and design (may request more info)
  3. Approval for installation
  4. Install; submit Part 2 / Certificate of Completion
  5. Permission to operate granted

Fees

FeeApplies toNote
$0Level 1
$50 + $1/kW export capacityLevel 2
$100 + $2/kW export capacity (max $10,000)Level 3

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 150 kWsmart inverter, nameplate <=50 kW AC and export <=25 kW AC, certified per N.J.A.C. 14:8-5.3
Level 22000 kWexport capacity <=2 MW AC
Level 3export >2 MW or not Level 1/2

levels based on aggregate system rating / export capacity

Storage, EV and stamps

Battery storage

Energy Storage Supplemental Form; NJ levels screen on export capacity.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited