Home › Utilities › New Jersey › Rockland Electric (O&R New Jersey)
Investor-owned utilityRockland Electric (O&R New Jersey) interconnection application
Rockland Electric (O&R New Jersey) is an investor-owned utility serving 66,678 residential customers in New Jersey (EIA-861, 2025). Applications: PowerClerk (RECO DG Interconnection PowerClerk). Gridpol files Rockland Electric (O&R New Jersey) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Rockland Electric (O&R New Jersey)’s official sources (see below). NJ regulatory timelines not restated.
Rockland Electric (O&R New Jersey) at a glance
Rockland Electric Co (Consolidated Edison Inc)
TypeInvestor-owned utility
EIA utility ID16213
Residential customers66,678 (EIA-861, 2025)
Net-metered residential customers1,654 (EIA-861, 2025)
Service territory3 counties in New Jersey
How to applyPowerClerk – RECO DG Interconnection PowerClerk · official link
Who submitsCustomer or agent; agent must upload customer letter of authorization.
Export compensationNEM – New Jersey net metering (N.J.A.C. 14:8-4)
Documents Rockland Electric (O&R New Jersey) asks for
- Interconnection application formApplication/Agreement Gridpol prepares this.
- Three-line diagramthree-line electrical schematic Gridpol prepares this.
- Letter of authorization / designated agent form (when applicable)if applicant is agent
- Inverter spec sheetmanufacturer data sheet
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- Other utility-specific documentmanufacturer verification test procedures (contractor certification)
- UL 1741 / IEEE 1547 certificationUL1741SB compliance certificate
- Battery spec sheet (when applicable)Energy Storage Supplemental Form
- Final inspection sign-offInterconnection Agreement Part 2 / Certificate of Completion
How the Rockland Electric (O&R New Jersey) process runs
- Upload application and documents in PowerClerk
- Utility reviews application and design (may request more info)
- Approval for installation
- Install; submit Part 2 / Certificate of Completion
- Permission to operate granted
Fees
| Fee | Applies to | Note |
|---|---|---|
| $0 | Level 1 | |
| $50 + $1/kW export capacity | Level 2 | |
| $100 + $2/kW export capacity (max $10,000) | Level 3 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 50 kW | smart inverter, nameplate <=50 kW AC and export <=25 kW AC, certified per N.J.A.C. 14:8-5.3 |
| Level 2 | 2000 kW | export capacity <=2 MW AC |
| Level 3 | export >2 MW or not Level 1/2 |
levels based on aggregate system rating / export capacity
Storage, EV and stamps
Battery storage
Energy Storage Supplemental Form; NJ levels screen on export capacity.
Sources
- O&R Applying for Private Generation Interconnection in New Jersey: https://www.oru.com/en/save-money/using-private-generation-energy-sources/applying-for-private-generation-interconnection-in-new-jersey (retrieved 2026-11-13)
- NJ BPU rule adoption R.2026 d.010 (N.J.A.C. 14:8-5 amendments): https://www.nj.gov/bpu/pdf/rules/R.2026%20d.010%20(58%20N.J.R.%2072(a)).pdf (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.