Home › Utilities › New Jersey › Atlantic City Electric

Investor-owned utility

Atlantic City Electric interconnection application

Atlantic City Electric is an investor-owned utility serving 509,015 residential customers in New Jersey (EIA-861, 2025). Applications: Own online portal (Connect the Grid Interconnection Portal (Green Power Connection)). Gridpol files Atlantic City Electric interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Atlantic City Electric’s official sources (see below). verify on first project: ACE NJ forms & fees page returned 'Page Not Found' on 2026-11-13; fee table and NJ form list not confirmed from ACE.

Atlantic City Electric at a glance

Utility

Atlantic City Electric Co (Exelon (Pepco Holdings))

Type

Investor-owned utility

EIA utility ID

963

Residential customers

509,015 (EIA-861, 2025)

Net-metered residential customers

57,732 (EIA-861, 2025)

Service territory

8 counties in New Jersey

How to apply

Own online portal – Connect the Grid Interconnection Portal (Green Power Connection) · official link

Who submits

Contractor registers in portal and submits on behalf of customer; customer and contractor both track status.

Export compensation

NEM – New Jersey net metering (N.J.A.C. 14:8-4)

Documents Atlantic City Electric asks for

  • Interconnection application formUtility Level 1 (or Level 2-4) Interconnection Application/Agreement uploaded in Connect the Grid Gridpol prepares this.
  • Recent electric billcustomer's recent bill
  • PV module spec sheetmanufacturer spec sheets of proposed system
  • Inverter spec sheetmanufacturer spec sheets
  • Single-line diagram (one-line)electronic single-line drawing Gridpol prepares this.
  • Site plan / site layoutelectronic site plan Gridpol prepares this.
  • Customer signaturesignatures on application/agreement
  • Battery spec sheet (when applicable)Energy Storage Supplemental Form when storage is included
  • Final inspection sign-offApplication Part 2 / Certificate of Completion after install with local electrical inspection

How the Atlantic City Electric process runs

  1. Contractor registers and logs in to the Connect the Grid portal
  2. Contractor completes online application, uploads utility interconnection form/agreement, technical documents and signatures, submits
  3. System calculates fee and emails invoice; fees must be paid before technical review
  4. Application proceeds through approval steps; customer and contractor track status in dashboard
  5. Contractor installs the system (after approval)
  6. Contractor completes Application Part 2 in the portal (completion/inspection)
  7. After final review the utility emails Permission to Operate to customer and contractor

Size levels and limits

LevelUp toNote

NJ levels per N.J.A.C. 14:8-5 (see NJ entries)

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited