JCP&L is an investor-owned utility serving 1,047,687 residential customers in New Jersey (EIA-861, 2025). Applications: Own online portal (FirstEnergy Interconnection Portal). Gridpol files JCP&L interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from JCP&L’s official sources (see below).
JCP&L at a glance
Jersey Central Power & Lt Co (FirstEnergy)
TypeInvestor-owned utility
EIA utility ID9726
Residential customers1,047,687 (EIA-861, 2025)
Net-metered residential customers59,252 (EIA-861, 2025)
Service territory13 counties in New Jersey
How to applyOwn online portal – FirstEnergy Interconnection Portal · official link
Who submitsCustomer or third party (incl. community solar developers) via portal; name on application must match JCP&L account holder.
Export compensationNEM – New Jersey net metering (N.J.A.C. 14:8-4)
Review time (official)Notification within 10 to 30 days after engineering review depending on size/complexity (JCP&L page); NJ BPU rules govern.
Documents JCP&L asks for
- Interconnection application formNJ Level 1 (<=10 kW, UL 1741) / Level 2 / Level 3 application (rev. 7/2023) Gridpol prepares this.
- Site plan / site layoutno overhead internet photos; property layout, north arrow, nearest cross streets, route/length of connection, DER AC disconnect location (visible-break for CT metering), generation/inverter/storage locations, service transformer Gridpol prepares this.
- Single-line diagram (one-line)energy source with DC/AC ratings, inverter AC rating, disconnect make/model and lockable visible break, connection point, utility meter, inverter and battery equipment Gridpol prepares this.
- Battery spec sheet (when applicable)Interconnection Battery Application Addendum (2/24) for applications with storage
- Interconnection agreementwith Certificate of Completion after installation
- Final inspection sign-offUniform Construction Code (UCC) Certificate of electrical inspection; photo of UCC sticker NOT acceptable
- Other utility-specific document (when applicable)New-construction/no-history form; Public Entity Certification for remote net metering; IEEE 1547-2018 specified inverter settings
How the JCP&L process runs
- Determine size/type and application level (online portal determines level from data entered)
- Submit application with site plan and one-line diagram in the FirstEnergy Interconnection Portal; pay fee online
- Engineering review; customer notified by email/phone: approved, upgrade+fee required, or information missing/incorrect
- Install per approved application and FirstEnergy interconnection requirements
- Submit signed Interconnection Agreement with Certificate of Completion and UCC Certificate of electrical inspection
- Company final review, possible witness test, Approval to Operate (do not energize before)
- Company replaces meter with bi-directional net meter (may take several weeks; excess not credited until installed)
Fees
| Fee | Applies to | Note |
|---|---|---|
| $50 + $1/kW AC (max $100) | Level 1 | based on total generation + storage AC capacity |
| $50 + $1/kW AC | Level 2 | |
| $100 + $10/kW AC (max $10,000) | Level 3 |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Level 1 | 10 kW | inverter-based UL 1741, most residential |
| Level 2 | 2000 kW | inverter-based UL 1741 |
| Level 3 | facilities not qualifying for Level 1/2 |
store-only applicants choose level by total capacity
Storage, EV and stamps
Battery storage
Battery Application Addendum required; fees and level based on total generation + storage AC capacity; add-on procedure for adding storage/solar to existing systems.
Common issues the utility lists
- Application not completed correctly
- Drawings/documentation missing
- Fees not determined/paid
- Overhead internet photos submitted instead of a site plan
- Design inconsistent with company policy/state requirements
- Picture of UCC construction sticker submitted instead of UCC certificate
- Name on application does not match account holder
Gridpol’s pre-submission check covers these before we file.
Sources
- FirstEnergy New Jersey Interconnection (JCP&L): https://firstenergycorp.com/feconnect/newjersey.html (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.