JCP&L is an investor-owned utility serving 1,047,687 residential customers in New Jersey (EIA-861, 2025). Applications: Own online portal (FirstEnergy Interconnection Portal). Gridpol files JCP&L interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from JCP&L’s official sources (see below).

JCP&L at a glance

Utility

Jersey Central Power & Lt Co (FirstEnergy)

Type

Investor-owned utility

EIA utility ID

9726

Residential customers

1,047,687 (EIA-861, 2025)

Net-metered residential customers

59,252 (EIA-861, 2025)

Service territory

13 counties in New Jersey

How to apply

Own online portal – FirstEnergy Interconnection Portal · official link

Who submits

Customer or third party (incl. community solar developers) via portal; name on application must match JCP&L account holder.

Export compensation

NEM – New Jersey net metering (N.J.A.C. 14:8-4)

Review time (official)

Notification within 10 to 30 days after engineering review depending on size/complexity (JCP&L page); NJ BPU rules govern.

Documents JCP&L asks for

  • Interconnection application formNJ Level 1 (<=10 kW, UL 1741) / Level 2 / Level 3 application (rev. 7/2023) Gridpol prepares this.
  • Site plan / site layoutno overhead internet photos; property layout, north arrow, nearest cross streets, route/length of connection, DER AC disconnect location (visible-break for CT metering), generation/inverter/storage locations, service transformer Gridpol prepares this.
  • Single-line diagram (one-line)energy source with DC/AC ratings, inverter AC rating, disconnect make/model and lockable visible break, connection point, utility meter, inverter and battery equipment Gridpol prepares this.
  • Battery spec sheet (when applicable)Interconnection Battery Application Addendum (2/24) for applications with storage
  • Interconnection agreementwith Certificate of Completion after installation
  • Final inspection sign-offUniform Construction Code (UCC) Certificate of electrical inspection; photo of UCC sticker NOT acceptable
  • Other utility-specific document (when applicable)New-construction/no-history form; Public Entity Certification for remote net metering; IEEE 1547-2018 specified inverter settings

How the JCP&L process runs

  1. Determine size/type and application level (online portal determines level from data entered)
  2. Submit application with site plan and one-line diagram in the FirstEnergy Interconnection Portal; pay fee online
  3. Engineering review; customer notified by email/phone: approved, upgrade+fee required, or information missing/incorrect
  4. Install per approved application and FirstEnergy interconnection requirements
  5. Submit signed Interconnection Agreement with Certificate of Completion and UCC Certificate of electrical inspection
  6. Company final review, possible witness test, Approval to Operate (do not energize before)
  7. Company replaces meter with bi-directional net meter (may take several weeks; excess not credited until installed)

Fees

FeeApplies toNote
$50 + $1/kW AC (max $100)Level 1based on total generation + storage AC capacity
$50 + $1/kW ACLevel 2
$100 + $10/kW AC (max $10,000)Level 3

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 110 kWinverter-based UL 1741, most residential
Level 22000 kWinverter-based UL 1741
Level 3facilities not qualifying for Level 1/2

store-only applicants choose level by total capacity

Storage, EV and stamps

Battery storage

Battery Application Addendum required; fees and level based on total generation + storage AC capacity; add-on procedure for adding storage/solar to existing systems.

Common issues the utility lists

  • Application not completed correctly
  • Drawings/documentation missing
  • Fees not determined/paid
  • Overhead internet photos submitted instead of a site plan
  • Design inconsistent with company policy/state requirements
  • Picture of UCC construction sticker submitted instead of UCC certificate
  • Name on application does not match account holder

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.