Home › Utilities › New Hampshire › New Hampton Village Precinct

Municipal utility

New Hampton Village Precinct interconnection application

New Hampton Village Precinct is a municipal utility serving 82 customers in New Hampshire (EIA-861, 2025). Gridpol files New Hampton Village Precinct interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

New Hampshire’s commission rule (N.H. Code Admin. R. En 1000 (interconnection, rulemaking RUL 2024-007); net metering En 900 (formerly Puc 900)) does not bind municipal utilitys; New Hampton Village Precinct sets its own interconnection policy. We confirm its form on the first project. Customers of municipal electric utilities must ask their utility whether net metering is available (NH DOE page).

New Hampton Village Precinct at a glance

Utility

New Hampton Village Precinct

Type

Municipal utility

EIA utility ID

13286

Customers

82 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

1 county in New Hampshire

Documents New Hampton Village Precinct asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for New Hampton Village Precinct. We confirm New Hampton Village Precinct’s exact list on the first project.

New Hampshire interconnection rule

En 1000 text (adopted July 2026 per brief) could not be read: gc.nh.gov unreachable from all tools, no archive.org copy, DOE rules page still lists only En 900. Levels, timelines, fees, insurance, disconnect and documents left empty - fill from En 1000 text.

Commission

New Hampshire Public Utilities Commission / NH Department of Energy (rules En 900, En 1000)

Interconnection rule

N.H. Code Admin. R. En 1000 (interconnection, rulemaking RUL 2024-007); net metering En 900 (formerly Puc 900) – En 1000 Interconnection rules · source

Applies to

Rate-regulated distribution utilities: Eversource (PSNH), Liberty Utilities, Unitil, and NH Electric Cooperative; municipal utilities not covered

Export compensation

NEM – RSA 362-A:9; En 900; Net Metering Tariff 2023 (NEM 2023)
Residential/small commercial up to 100 kW AC behind the meter; larger facilities up to 1,000 kW (political subdivisions 5,000 kW). Statutory per-utility aggregate limit. Compensation per 2023 net metering tariff (DOE overview PDF).

Not bound by the rule

Customers of municipal electric utilities must ask their utility whether net metering is available (NH DOE page).

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited