Home › Utilities › New Hampshire › NHEC (New Hampshire Electric Co-op)

Electric cooperative

NHEC (New Hampshire Electric Co-op) interconnection application

NHEC (New Hampshire Electric Co-op) is an electric cooperative serving 74,619 residential customers in New Hampshire (EIA-861, 2025). Applications: Own online portal (NHEC Solar & Battery Interconnection Application (online form via NHEC SmartHub/FormAssembly)). Gridpol files NHEC (New Hampshire Electric Co-op) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from NHEC (New Hampshire Electric Co-op)’s official sources (see below). Portal, documents and steps confirmed from NHEC page, online form and T&C Section X. Gaps: current export credit rate values not taken from Schedule of Rates; NH En 1000 rules (2026) applicability to NHEC not checked.

NHEC (New Hampshire Electric Co-op) at a glance

Utility

New Hampshire Elec Coop Inc

Type

Electric cooperative

EIA utility ID

13441

Residential customers

74,619 (EIA-861, 2025)

Net-metered residential customers

2,048 (EIA-861, 2025)

Service territory

9 counties in New Hampshire

How to apply

Own online portal – NHEC Solar & Battery Interconnection Application (online form via NHEC SmartHub/FormAssembly) · official link

Who submits

Member or contractor may complete the online application (form asks who is completing it); member is the member-generator, acknowledges T&C Section X and authorizes NHEC to share account info with the installer. Account must be current (no balance 30+ days overdue).

Export compensation

Net billing – NHEC Terms & Conditions Section X - Net Metering (individual and group)
Delivered energy billed under Schedule of Rates; exported energy credited at the export rate of the member's class (members with a competitive supplier do not get the Co-op Power portion). Annual review after March billing: dollar credit >=$50 can be carried or paid by check; payout also possible after June/September cycles. Optional net-metering time-of-day rates.

Review time (official)

NHEC notifies completeness in writing within 20 business days of receipt (T&C X.2.e). Accepted applications hold a queue number for 12 months; installation must be completed within 12 months of acceptance or the queue number expires. Increasing AC inverter rating loses queue position.

Documents NHEC (New Hampshire Electric Co-op) asks for

  • Interconnection application formOnline Interconnection Application (solar, solar+battery, battery only); equipment data incl. NHEC pole number; UL 1741 SA inverters per IEEE 1547-2018 Gridpol prepares this.
  • Single-line diagram (one-line)One-line drawing required for all interconnection-facilities and battery/backup installations; show exterior production meter socket, utility-accessible disconnect, 'line to solar - load to utility' Gridpol prepares this.
  • Battery spec sheet (when applicable)Battery section: manufacturer/model/qty, kW/kVA, kWh, UL 1741 SA/SB listing, grid charging, off-grid/backup operation, switching
  • Interconnection agreementMutual Indemnity Agreement (T&C X / NH PUC 904.03) accepted in the form
  • Other utility-specific documentRenewable Energy Certificate Member Agreement - choose option (e.g. keep RECs with monitoring fee, give to NHEC, sell to NHEC)
  • Final inspection sign-offAfter install: local building inspector (or NH licensed electrician if none) signs the Interconnection Application for code compliance
  • Other utility-specific documentWitness test: load-break test (generator shuts down within 2 s) performed by member/contractor and signed on the application

How the NHEC (New Hampshire Electric Co-op) process runs

  1. Optional pre-application review; finalize design with installer; read T&C Section X and Schedule of Rates/Fees
  2. Submit online Solar & Battery Interconnection Application with one-line drawing, REC agreement and indemnity; pay application fee
  3. NHEC completeness review within 20 business days; queue number assigned; system modifications estimated and prepaid if needed
  4. NHEC notifies application complete - install (exterior production meter socket at 66 in., utility-accessible disconnect, placards)
  5. Local building inspector (or NH licensed electrician) signs application; contractor performs load-break witness test and signs
  6. NHEC inspection; if passed NHEC installs meters and signs application authorizing operation (copy to member)

Fees

FeeApplies toNote
$220Interconnection application up to 25 kW ACSchedule of Fees eff. Jan 1, 2026
$600>25 kW to 100 kW AC
$1,000>100 kW AC
$320Interconnection site visiteach subsequent trip if facility fails inspection
estimated costSystem modifications/upgradesmember pays in advance

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Fee tier <=25 kW AC25 kW
Fee tier 25-100 kW AC100 kW
Net metering max1000 kWtotal AC inverter nameplate <=1 MW; separate form option for >1 MW
Net metering cap1000 kW

NHEC T&C Section X

Storage, EV and stamps

Battery storage

Storage facilities are included in 'interconnection-facility' under T&C X. Application requires battery details (DC/AC coupling, shared inverter, export or no-export, whether chargeable from grid and how prevented, off-grid/backup operation, disconnect/reconnect switching) and a one-line for battery/backup installations; UL 1741 SA/SB listing asked.

Common issues the utility lists

  • Application without one-line diagram will not be accepted
  • Incomplete application (NHEC states missing items in writing)
  • Production meter not 66 in. above grade or within 10 ft of LP gas regulators/tanks
  • Missing/incorrect placards (red background, white lettering) on net and production meters
  • No exterior utility-accessible disconnect at production meter
  • Wrong wiring: solar must be on line side (top), grid/panel on load side (bottom)
  • Load-break test fails (no shutdown within 2 s)
  • Increase of AC inverter rating after application (loses queue position)

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited