Home › Utilities › New Hampshire › Liberty (New Hampshire Electric)

Investor-owned utility

Liberty (New Hampshire Electric) interconnection application

Liberty (New Hampshire Electric) is an investor-owned utility serving 39,815 residential customers in New Hampshire (EIA-861, 2025). Applications: PDF + email (Application package by email). Gridpol files Liberty (New Hampshire Electric) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Liberty (New Hampshire Electric)’s official sources (see below). Detailed document list (one-line, spec sheets) not stated on page - check application form. NH DOE adopted new interconnection rules En 1000 (RUL 2024-007, listed as adopted 7/17/26) replacing Puc 900 for DER <5 MW; text not accessible (energy.nh.gov 403) - verify current tiers/timelines.

Liberty (New Hampshire Electric) at a glance

Utility

Liberty Utilities (Granite State Electri (Algonquin Power & Utilities)

Type

Investor-owned utility

EIA utility ID

26510

Residential customers

39,815 (EIA-861, 2025)

Net-metered residential customers

1,814 (EIA-861, 2025)

Service territory

5 counties in New Hampshire

How to apply

PDF + email – Application package by email · official link

Who submits

Customer/installer emails completed package to NHNetmetering@libertyutilities.com (or mail to Liberty, Attn Solar and Renewables, 9 Lowell Rd, Salem NH 03079).

Export compensation

Net billing – NH Net Metering (NHPUC No. 23 tariff)
Monetary credits for default service customers only

Review time (official)

Tariff: Liberty responds within 30 days (request more info or site-specific requirements); net meter typically ~10 days after completion documents. NH DOE adopted new interconnection rules En 1000 (RUL 2024-007, listed as adopted 7/17/26) replacing Puc 900 for DER <5 MW; text not accessible (energy.nh.gov 403) - verify current tiers/timelines.

Documents Liberty (New Hampshire Electric) asks for

  • Interconnection application formLiberty interconnection/net metering application (LUSIA2018.pdf) Gridpol prepares this.
  • Final inspection sign-offCompletion documents before net meter installation

How the Liberty (New Hampshire Electric) process runs

  1. Email completed application package BEFORE purchasing equipment.
  2. Liberty reviews under its Interconnection Standards for DG and returns signed approval.
  3. Pay application fee; purchase and install equipment; notify Liberty before installation.
  4. Submit completion documents.
  5. Liberty installs bidirectional net meter (~10 days).
  6. Receive Authority to Interconnect letter; keep system off until then.

Fees

FeeApplies toNote
$200<=25 kWsince 1/1/2025
$500>25-100 kW
$1,000>100 kW

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Standard program100 kW>100 kW special process

Storage, EV and stamps

Battery storage

Separate Battery Storage page exists; not reviewed.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited