Home › Utilities › Mississippi › Mississippi Power

Investor-owned utility

Mississippi Power interconnection application

Mississippi Power is an investor-owned utility serving 158,206 residential customers in Mississippi (EIA-861, 2025). Applications: PowerClerk (Mississippi Power Interconnections PowerClerk (Levels 1-2)). Gridpol files Mississippi Power interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Mississippi Power’s official sources (see below). Required SLD/site plan for Level 1 not itemized in application text; confirm in PowerClerk.

Mississippi Power at a glance

Utility

Mississippi Power Co (Southern Company)

Type

Investor-owned utility

EIA utility ID

12686

Residential customers

158,206 (EIA-861, 2025)

Net-metered residential customers

530 (EIA-861, 2025)

Service territory

23 counties in Mississippi

How to apply

PowerClerk – Mississippi Power Interconnections PowerClerk (Levels 1-2) · official link

Who submits

Customer or a customer-authorized installer; installer usually submits Level 1/2 in PowerClerk as a courtesy. Level 3: PDF emailed to MPCInterconnections@southernco.com.

Export compensation

Net billing – Renewable Energy Net Metering RENM-2 (MS Distributed Generation Rule)
Monthly netting; excess purchased by MPC; transferring RECs to MPC makes customer eligible for Distributed Generation Value component.

Review time (official)

Level 1: submit ≥30 business days before desired interconnection; completeness status within 10 business days; review/screens within 15 business days after complete; meter replaced within 10 business days after final approval; interconnection must complete within 90 calendar days of conditional approval. Level 2: submit ≥60 business days ahead.

Documents Mississippi Power asks for

  • Interconnection application formDistributed Generator Interconnection Application and Agreement (Level 1 ≤20 kW / Level 2 / Level 3) Gridpol prepares this.
  • PV module spec sheet (when applicable)Manufacturer specification sheets 'if available'
  • Inverter spec sheet (when applicable)Manufacturer spec sheets if available
  • Customer signatureCustomer signs agreement incl. REC transfer election and incentive elections
  • Final inspection sign-off (when applicable)Approval by local code office(s), if applicable
  • Other utility-specific document (when applicable)LMI qualification and W-9 if electing LMI incentive / incentive payment

How the Mississippi Power process runs

  1. Select installer.
  2. Submit application in PowerClerk (L1/L2) or emailed PDF (L3).
  3. MPC completeness notice (10 business days), queue position, screening review -> conditional approval or denial.
  4. Install per local codes; keep system off.
  5. Local code approval; schedule witness test (48-hour notice).
  6. Witness test passed; MPC executes Certificate of Completion (emailed) = permission to operate; meter replaced if needed.

Fees

FeeApplies toNote
$0Level 1 ≤20 kWNo processing fee
$50Level 2 >20 kW-2 MWProcessing fee (per Level 2 application)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Level 120 kWInverter-based
Level 22000 kW
Level 3>2 MW or not qualifying for L1/L2
Net metering cap20 kW

RENM: residential lesser of 110% of prior-year annual peak demand or 20 kW DC; non-residential lesser of 110% or 2 MW DC; RENM-2 capped at 3% of 2022 system peak. Residential >20-100 kW may use CSPP.

Storage, EV and stamps

Battery storage

Battery listed as generator type in DG process. RENM-I offered one-time $2,000 Residential Demand Response Battery Incentive (RENM-I schedule now marked 'under suspension').

Common issues the utility lists

  • Incomplete application - additional/clarifying information requested.
  • Level 1 denied after screening -> may resubmit as Level 2 within 15 business days keeping queue position.

Gridpol’s pre-submission check covers these before we file.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited