Electric cooperative4-County Electric Power Association interconnection application
4-County Electric Power Association is an electric cooperative serving 41,491 residential customers in Mississippi (EIA-861, 2025). Gridpol files 4-County Electric Power Association interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Mississippi’s commission rule (Miss. Admin. Code Title 39, Part IV, Subpart I - Mississippi Distributed Generator Interconnection Rule (MDGIR)) does not bind electric cooperatives; 4-County Electric Power Association sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and TVA-served distributors are not MPSC rate-regulated and follow their own/TVA programs. Applicability to non-IOU PSC-jurisdictional cooperatives not confirmed for the 2022 rule.
4-County Electric Power Association at a glance
4-County Electric Power Assn
TypeElectric cooperative
EIA utility ID6641
Residential customers41,491 (EIA-861, 2025)
Net-metered residential customersnone reported
Service territory7 counties in Mississippi
Wholesale supplier / associationTennessee Valley Authority (TVA) - local power company (distributor) network · TVA Dispersed Power Production (DPP) Guidelines + Dispersed Power Price Schedule CSPP (Attachment A)
Documents 4-County Electric Power Association asks for
- Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
- Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
- Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
- PV module spec sheetManufacturer data sheet of the modules.
- Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
- Customer signatureThe account holder signs the application or authorization. We send the signature link.
- Recent electric billName, service address, account and meter number must match the application.
- Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.
Typical documents for US utilities – not yet verified for 4-County Electric Power Association. We confirm 4-County Electric Power Association’s exact list on the first project.
Mississippi interconnection rule
Interconnection details from 2015 MDGIR text; net generation details from the 2022 proposed amendment filed with SOS - final adopted 2022 text not retrieved. Coop applicability unconfirmed.
Mississippi Public Service Commission
Interconnection ruleMiss. Admin. Code Title 39, Part IV, Subpart I - Mississippi Distributed Generator Interconnection Rule (MDGIR) – Mississippi Distributed Generator Interconnection Rule · source
Applies toElectric Utilities (EUs) under MPSC jurisdiction (EU as defined in Miss. Code Ann. 77-3-3(d)(i)): Entergy Mississippi, Mississippi Power and PSC-jurisdictional electric utilities. MPSC described the 2022 amendments as applying to customers of investor-owned utilities.
Application formCommission-approved Standard Interconnection Application; for Level 1 the application and agreement are one combined document; Certificate of Completion in Commission-approved form
TimelinesCompleteness notice within 10 business days of receipt (customer has 10 business days to cure); Level 1 screens/conditional approval within 15 business days after completeness; Level 2 agreement within 5 business days after passing screens; resubmittals reviewed within 20 business days.
FeesLevel 1: none. Level 2: <=$50 + $1/kW. Level 3: <=$100 + $2/kW plus study costs; engineering capped at $100/h. Fees must be published on each EU's website. No other fees, equipment or insurance requirements unless authorized by the rules or Commission.
InsuranceInterconnection customer is not required to obtain general liability insurance as a precondition for interconnection approval (standard application/agreement insurance disclosure); EU may not require insurance unless authorized by the rules.
External disconnectLevel 2 and 3: lockable, visible-break isolation device accessible to the EU required. Level 1 interconnections do not require an external disconnect.
Export compensationNet billing – Miss. Admin. Code Title 39, Part IV, Subpart II - Mississippi Distributed Generation Rule (net generation; amended 2022)
Residential: lesser of 110% of annual peak demand or 20 kW DC; non-residential: lesser of 110% or 2 MW (2022 text). Exports credited at Total Value of DG = avoided cost of wholesale power + 2.5 c/kWh DG value (+2 c/kWh low-to-moderate income adder), fixed 25 years; negative bill amounts carried forward; balance paid on account closure. Battery capacity does not count toward size limit.
Municipal utilities and TVA-served distributors are not MPSC rate-regulated and follow their own/TVA programs. Applicability to non-IOU PSC-jurisdictional cooperatives not confirmed for the 2022 rule.
- MPSC - Mississippi Distributed Generator Interconnection Rule and Net Metering Rule (2015 text): https://www.psc.ms.gov/sites/default/files/Documents/Net%20Meeting%20and%20Interconnection%20Rules.pdf (retrieved 2026-11-13)
- MS SOS - proposed amended Mississippi Distributed Generation Rule (Title 39 Part IV Subpart II): https://www.sos.ms.gov/adminsearch/ACProposed/00028091b.pdf (retrieved 2026-11-13)
- MPSC news release 2022-10-04 - Updated Distributed Generation Rules: https://www.psc.ms.gov/sites/default/files/2022-10/RELEASE_BrentBaileyAnnouncesUpdatedDistributedGenerationRules.pdf (retrieved 2026-11-13)
Other utilities in Mississippi
- Entergy Mississippi384,493
- Mississippi Power158,206
- Coast Electric Power Association84,194
- Singing River Electric Cooperative73,398
- Southern Pine Electric Cooperative65,580
- Pearl River Valley El Power Association52,557
- Dixie Electric Power Association37,963
- Tombigbee Electric Power Association37,347
- Magnolia Electric Power Association31,161
- Central Electric Power Association31,032
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.