Home › Utilities › Kansas

Kansas

Kansas interconnection applications

150 electric utilities serve Kansas (EIA-861, 2025): 4 investor-owned utilitys, 117 municipal utilitys, 27 electric cooperatives, 1 public power district, 1 federal power agency. Together they serve 1,124,001 residential customers; 9,805 residential customers were on net metering at year-end 2025.

Largest utilities in Kansas

Evergy (Kansas Central)Process verified

Investor-owned utility · 343,712 residential customers · Kansas

Applications: Own online portal – Evergy KS Central DER-Net Meter Application Portal

Interconnection process and documents →
Evergy (Kansas South)Partly researched

Investor-owned utility · 305,665 residential customers · Kansas

Applications: Own online portal – Evergy KS Central DER-Net Meter Application Portal

Interconnection process and documents →
Evergy (Missouri Metro / Kansas Metro)Process verified

Investor-owned utility · 523,588 residential customers · Kansas

Applications: Own online portal – Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com

Interconnection process and documents →
City of Kansas CityState rule applies

Municipal utility · 62,103 residential customers · Kansas

Interconnection process and documents →
Midwest Energy Inc.State rule applies

Electric cooperative · 29,779 residential customers · Kansas

Interconnection process and documents →
Wheatland Electric Cooperative, Inc.State rule applies

Electric cooperative · 20,138 residential customers · Kansas

Interconnection process and documents →
FreeState Electric CooperativeState rule applies

Electric cooperative · 17,654 residential customers · Kansas

Interconnection process and documents →
Victory Electric Cooperative Association Inc.State rule applies

Electric cooperative · 14,374 residential customers · Kansas

Interconnection process and documents →
Prairie Land Electric Cooperative Inc.State rule applies

Electric cooperative · 13,245 residential customers · Kansas

Interconnection process and documents →
Southern Pioneer Electric CompanyState rule applies

Electric cooperative · 12,608 residential customers · Kansas

Interconnection process and documents →
City of Garden CityState rule applies

Municipal utility · 10,458 residential customers · Kansas

Interconnection process and documents →
Liberty (Empire District)Process verified

Investor-owned utility · 161,373 residential customers · Kansas

Applications: PDF + mail – Interconnection Application/Agreement for Net Metering Systems (Rider NM)

Interconnection process and documents →

Export compensation among the researched Kansas utilities: NEM. Rules differ by utility – see each utility page.

Kansas interconnection rule

Commission

Kansas Corporation Commission (KCC)

Interconnection rule

K.S.A. 66-1,184 (parallel generation, as amended L. 2025 ch. 66 §4) and K.S.A. 66-1263 et seq. (Net Metering and Easy Connection Act, amended 2024 HB 2527); KCC-approved utility interconnection tariffs (standard interconnection process) – Parallel generation service / Net Metering and Easy Connection Act · source

Applies to

K.S.A. 66-1,184 binds every utility providing retail electric service in Kansas: IOUs, electric cooperatives (incl. coop-owned utilities) and municipal utilities. NMECA (net metering) binds investor-owned utilities only (Evergy, Empire/Liberty). KCC-regulated utilities follow their KCC-approved rules with a standard interconnection process or FERC procedures; non-KCC-regulated utilities follow FERC procedures (66-1,184(k)).

Application form

Utility-specific application under KCC-approved tariff (no statewide form found); utility may require application and verification of standards/codes (66-1,184(c)).

Timelines

Acknowledge receipt in writing within 30 days; approve or deny within 90 calendar days (not applicable if studies needed - estimate given); denial must state reasons and corrective actions (66-1,184(c)).

Fees

Utility may charge a nonrefundable application fee, study costs (incl. SPP studies) and upgrade/equipment costs; no other fees unless authorized; no charge for exported power (66-1,184(c),(l)). NMECA: for pre-2014 net-metering customers no added interconnection fee (66-1265(d)).

External disconnect

Utility may install a disconnecting device near the meter or require a utility-accessible switch or breaker (66-1,184(f)(5)). NMECA requires a UL-listed anti-islanding mechanism (66-1264(b)(5)).

Export compensation

NEM – K.S.A. 66-1263 to 66-1271 (Net Metering and Easy Connection Act) as amended by 2024 HB 2527
IOUs only. Post-2014-07-01 systems: residential 15 kW, commercial/ag/government 100 kW, schools 150 kW AC export; monthly net excess credited at >=100% of monthly system average cost of energy; aggregate 2% (2024) rising to 5% of peak (2027); from 2026-01-01 generating capacity may exceed export capacity by max 50%. Pre-2014 systems: 25/200 kW with kWh carry-forward until 2030. Customers of IOUs may alternatively choose 66-1,184 parallel generation (avoided cost).

Not bound by the rule

Coops and munis are bound by K.S.A. 66-1,184 parallel generation (export compensation >=100% avoided cost or LMP/system average cost option, 30/90-day timelines, sizing factor 0.288); non-KCC-regulated utilities follow FERC interconnection procedures. Not required to offer NMECA net metering.

LevelUp toCriteria / review / fee
Parallel generation (statutory, all sizes up to sizing formula)Export capacity sized to load: prior 12-month kWh / 8,760 / capacity factor 0.144 (IOU) or 0.288 (coop/muni), rounded up to 1 kW AC; listed equipment · Written acknowledgment within 30 days; approve/deny within 90 calendar days unless studies needed · Nonrefundable application fee + study and upgrade costs permitted

All 150 utilities in Kansas

Residential customers in Kansas per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited