Kansas interconnection applications
150 electric utilities serve Kansas (EIA-861, 2025): 4 investor-owned utilitys, 117 municipal utilitys, 27 electric cooperatives, 1 public power district, 1 federal power agency. Together they serve 1,124,001 residential customers; 9,805 residential customers were on net metering at year-end 2025.
Largest utilities in Kansas
Investor-owned utility · 343,712 residential customers · Kansas
Applications: Own online portal – Evergy KS Central DER-Net Meter Application Portal
Interconnection process and documents →Investor-owned utility · 305,665 residential customers · Kansas
Applications: Own online portal – Evergy KS Central DER-Net Meter Application Portal
Interconnection process and documents →Investor-owned utility · 523,588 residential customers · Kansas
Applications: Own online portal – Evergy DER application portal (<200 kW AC); >200 kW AC: evergydistributedic.customerapplication.com
Interconnection process and documents →Municipal utility · 62,103 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 29,779 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 20,138 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 17,654 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 14,374 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 13,245 residential customers · Kansas
Interconnection process and documents →Electric cooperative · 12,608 residential customers · Kansas
Interconnection process and documents →Municipal utility · 10,458 residential customers · Kansas
Interconnection process and documents →Investor-owned utility · 161,373 residential customers · Kansas
Applications: PDF + mail – Interconnection Application/Agreement for Net Metering Systems (Rider NM)
Interconnection process and documents →Export compensation among the researched Kansas utilities: NEM. Rules differ by utility – see each utility page.
Kansas interconnection rule
Kansas Corporation Commission (KCC)
Interconnection ruleK.S.A. 66-1,184 (parallel generation, as amended L. 2025 ch. 66 §4) and K.S.A. 66-1263 et seq. (Net Metering and Easy Connection Act, amended 2024 HB 2527); KCC-approved utility interconnection tariffs (standard interconnection process) – Parallel generation service / Net Metering and Easy Connection Act · source
Applies toK.S.A. 66-1,184 binds every utility providing retail electric service in Kansas: IOUs, electric cooperatives (incl. coop-owned utilities) and municipal utilities. NMECA (net metering) binds investor-owned utilities only (Evergy, Empire/Liberty). KCC-regulated utilities follow their KCC-approved rules with a standard interconnection process or FERC procedures; non-KCC-regulated utilities follow FERC procedures (66-1,184(k)).
Application formUtility-specific application under KCC-approved tariff (no statewide form found); utility may require application and verification of standards/codes (66-1,184(c)).
TimelinesAcknowledge receipt in writing within 30 days; approve or deny within 90 calendar days (not applicable if studies needed - estimate given); denial must state reasons and corrective actions (66-1,184(c)).
FeesUtility may charge a nonrefundable application fee, study costs (incl. SPP studies) and upgrade/equipment costs; no other fees unless authorized; no charge for exported power (66-1,184(c),(l)). NMECA: for pre-2014 net-metering customers no added interconnection fee (66-1265(d)).
External disconnectUtility may install a disconnecting device near the meter or require a utility-accessible switch or breaker (66-1,184(f)(5)). NMECA requires a UL-listed anti-islanding mechanism (66-1264(b)(5)).
Export compensationNEM – K.S.A. 66-1263 to 66-1271 (Net Metering and Easy Connection Act) as amended by 2024 HB 2527
IOUs only. Post-2014-07-01 systems: residential 15 kW, commercial/ag/government 100 kW, schools 150 kW AC export; monthly net excess credited at >=100% of monthly system average cost of energy; aggregate 2% (2024) rising to 5% of peak (2027); from 2026-01-01 generating capacity may exceed export capacity by max 50%. Pre-2014 systems: 25/200 kW with kWh carry-forward until 2030. Customers of IOUs may alternatively choose 66-1,184 parallel generation (avoided cost).
Coops and munis are bound by K.S.A. 66-1,184 parallel generation (export compensation >=100% avoided cost or LMP/system average cost option, 30/90-day timelines, sizing factor 0.288); non-KCC-regulated utilities follow FERC interconnection procedures. Not required to offer NMECA net metering.
| Level | Up to | Criteria / review / fee |
|---|---|---|
| Parallel generation (statutory, all sizes up to sizing formula) | Export capacity sized to load: prior 12-month kWh / 8,760 / capacity factor 0.144 (IOU) or 0.288 (coop/muni), rounded up to 1 kW AC; listed equipment · Written acknowledgment within 30 days; approve/deny within 90 calendar days unless studies needed · Nonrefundable application fee + study and upgrade costs permitted |
- K.S.A. 66-1,184: https://ksrevisor.gov/statutes/chapters/ch66/066_001_0184.html (retrieved 2026-11-13)
- 2024 HB 2527 enrolled (NMECA amendments): https://kslegislature.gov/b2023_24/bills/download/?apn=b2023_24%2Fyear2%2Fready_for_publication%2Fhb_2527%2Fhb2527_enrolled.pdf (retrieved 2026-11-13)
All 150 utilities in Kansas
- Evergy (Kansas Central)343,712
- Evergy (Kansas South)305,665
- Evergy (Missouri Metro / Kansas Metro)247,426
- City of Kansas City62,103
- Midwest Energy Inc.29,779
- Wheatland Electric Cooperative, Inc.20,109
- FreeState Electric Cooperative17,654
- Victory Electric Cooperative Association Inc.14,374
- Prairie Land Electric Cooperative Inc.13,245
- Southern Pioneer Electric Company12,608
- City of Garden City10,458
- Liberty (Empire District)8,465
- City of McPherson7,462
- City of Winfield6,299
- Western Cooperative Electric Association Inc.5,800
- Pioneer Electric Cooperative, Inc.5,038
- City of Coffeyville4,717
- City of Chanute (KS)4,553
- CMS Electric Cooperative Inc.3,221
- Tri-County Electric Cooperative, Inc. (OK)1,110
- Alfalfa Electric Cooperative, Inc.203
- Southern Public Power District0
- Rolling Hills Electric Cooperative0
- Heartland Rural Electric Cooperative, Inc.0
- City of Gardner0
- DS&O Electric Cooperative, Inc.0
- Sedgwick County El Cooperative Association Inc.0
- Butler Rural El Cooperative Association, Inc.0
- Bluestem Electric Cooperative Inc.0
- Flint Hills Rural E C A, Inc.0
- City of Ottawa0
- Lane-Scott Electric Cooperative, Inc.0
- Ark Valley Electric Cooperative Association, Inc.0
- Caney Valley El Cooperative Association, Inc.0
- Sumner-Cowley Electric Cooperative, Inc.0
- City of Pratt0
- City of Wellington0
- City of Augusta0
- Ninnescah Rural E C A Inc.0
- City of Iola0
- Nemaha-Marshall E C A, Inc.0
- City of Russell0
- Brown-Atchison E C A Inc.0
- City of Colby0
- City of Mulvane0
- Twin Valley Electric Cooperative Inc.0
- City of Clay Center0
- City of Goodland0
- City of Eudora0
- City of Holton0
- City of Larned0
- City of Wamego0
- City of Garnett0
- City of Beloit0
- City of Osawatomie0
- City of Baldwin City0
- City of Hugoton0
- City of Kingman0
- City of Sabetha0
- City of Anthony0
- City of Lindsborg0
- City of Norton0
- City of Burlington0
- City of Girard0
- Doniphan Electric Cooperative Association, Inc.0
- City of Osage City0
- City of Hoisington0
- City of Neodesha0
- City of Fredonia0
- City of Hillsboro0
- City of Belleville0
- City of Herington0
- City of Oberlin0
- City of Sterling0
- City of Ellinwood0
- City of Marion0
- City of Seneca0
- City of Minneapolis0
- City of St Marys0
- City of Cimarron0
- City of Moundridge0
- City of Lakin0
- City of St Francis0
- City of Horton0
- City of Hill City0
- City of Meade0
- City of Stockton0
- City of La Crosse0
- City of Lincoln Center0
- City of Osborne0
- City of Dighton0
- City of Kiowa0
- City of Johnson0
- City of St. John0
- City of Arma0
- City of Washington0
- City of Stafford0
- City of Ashland0
- City of Greensburg0
- City of Chapman0
- City of Burlingame0
- City of Haven0
- City of Jetmore0
- City of Erie0
- City of Chetopa0
- City of Pomona0
- City of Wathena0
- City of Mankato0
- City of Sharon Springs0
- City of Oxford0
- City of Elwood0
- City of Alma0
- City of Troy0
- City of Montezuma0
- City of Altamont0
- City of Galva0
- City of Attica0
- City of Udall0
- City of Mount Hope0
- City of Cawker City0
- City of Enterprise0
- City of Glen Elder0
- City of Waterville0
- City of Lucas0
- City of Holyrood0
- City of Scranton0
- City of Glasco0
- City of Moran0
- City of Centralia0
- City of La Harpe0
- WAPA-- Western Area Power Administration0
- City of Axtell0
- City of Mulberry0
- City of Toronto0
- City of Arcadia0
- City of Robinson0
- City of Herndon0
- City of Morrill0
- City of Blue Mound0
- City of Luray0
- City of Bronson0
- City of Prescott0
- City of Summerfield0
- City of Vermillion0
- City of Muscotah0
- City of Iuka0
- City of Isabel0
- City of Savonburg0
- City of Elsmore0
- City of Radium0
Residential customers in Kansas per EIA-861 (2025). Customer counts = bundled + delivery-only service (EIA-861 Part A + Part D). Service territory is reported by county; a county can be served by several utilities.
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.