Investor-owned utilityEvergy (Kansas South) interconnection application
Evergy (Kansas South) is an investor-owned utility serving 305,665 residential customers in Kansas (EIA-861, 2025). Applications: Own online portal (Evergy KS Central DER-Net Meter Application Portal). Gridpol files Evergy (Kansas South) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Partly researched from official sources. Kansas South (former KG&E) assumed to use KS Central portal/process (Evergy standards list KS-Central/KS-Metro only) – verify on first project; size cap 15 vs 150 kW.
Evergy (Kansas South) at a glance
Evergy Kansas South, Inc (Evergy, Inc.)
TypeInvestor-owned utility
EIA utility ID10005
Residential customers305,665 (EIA-861, 2025)
Net-metered residential customers2,981 (EIA-861, 2025)
Service territory24 counties in Kansas
How to applyOwn online portal – Evergy KS Central DER-Net Meter Application Portal · official link
Who submitsApplicant (customer or installer); name/address must match customer bill or supporting documentation of association with account holder is required. Online portal preferred; single-PDF email to netmeteringapp@evergy.com or mail accepted.
Export compensationNEM – KS Central Net Metering Rider, Schedule NMR
Kansas Net Metering and Easy Connect Act (K.S.A. 66-1263 ff.)
Completeness notice within 10 business days; net metering technical review within 30 days (<15 kW in KS), 90 days for larger; post-installation inspection within 15 days in KS; approval valid 1 year.
Documents Evergy (Kansas South) asks for
- Interconnection application formApplication/Agreement for Interconnection of a Net Metered Facility (serves as application and interconnection agreement) Gridpol prepares this.
- Single-line diagram (one-line)Project-specific (no generic) legible one-line incl. storage, inverters, load center, production meter, DER disconnect, service meter Gridpol prepares this.
- Site plan / site layoutGeneral site plan showing generation, storage, production meter, DER disconnect, service meter Gridpol prepares this.
- PV module spec sheetPV spec sheets referencing UL certification
- Inverter spec sheetInverter spec sheets; Grid Support Utility Interactive certified
- Battery spec sheet (when applicable)Battery spec sheets referencing UL certification
- Photos (meter, main panel, equipment)At completion: photos of generation meter, DER AC disconnect, inverter, panels/battery + inverter settings
- Final inspection sign-offLocal electrical inspections/permits complete before Installation Complete notification
How the Evergy (Kansas South) process runs
- Contact Evergy / select program
- Submit complete application (portal) + $100 fee
- Completeness check (10 business days)
- Net metering technical review
- Pre-approval e-mail (conditional approvals list required changes/upgrades)
- Construction
- Installation Complete notification with photos and inverter settings
- Post-installation inspections (field design, metering, protection if needed)
- Written Permission to Operate
Fees
| Fee | Applies to | Note |
|---|---|---|
| $100 | Kansas net metering applications | Non-refundable unless denied; application not complete until received |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Net Metering residential | 15 kW | Per Standards Rev 1.2 Table 3-1; Evergy 2024 customer interest form lists 150 kW AC for KS Central residential/commercial/schools (Kansas 2024 law) – confirm |
| Parallel Generation – Non-Export | 10000 kW | |
| Net metering cap | 150 kW |
Conflicting sources: 15 kW (Rev 1.2) vs 150 kW AC (2024 form)
Storage, EV and stamps
Battery storage
Storage counted as DER; must appear on one-line and site plan; UL-certified battery spec sheets; meter enclosure/service conductors on supply-side connection sized for main + DER disconnect.
Common issues the utility lists
- Incomplete/illegible applications are returned
- Name/address not matching customer bill
- Generic (non project-specific) one-line diagrams
- Non-UL certified equipment
- Wrong application form for jurisdiction/program
- Data requests not answered within 10 business days → deemed withdrawn
Gridpol’s pre-submission check covers these before we file.
Sources
- Evergy Distribution Interconnection Standards and Procedures Rev 1.2: https://ss.evergy.com/Distribution%20Interconnection%20Standards%20and%20Procedures%20-Rev1.2.pdf (retrieved 2026-11-13)
- Evergy Net Metering Customer Interest Form 2024 (search snippet): https://bcg.evergy.com/-/media/documents/smart-energy/private-solar/net-metering-customer-interest-form-2024.pdf (retrieved 2026-11-13)
Kansas interconnection rule
Kansas Corporation Commission (KCC)
Interconnection ruleK.S.A. 66-1,184 (parallel generation, as amended L. 2025 ch. 66 §4) and K.S.A. 66-1263 et seq. (Net Metering and Easy Connection Act, amended 2024 HB 2527); KCC-approved utility interconnection tariffs (standard interconnection process) – Parallel generation service / Net Metering and Easy Connection Act · source
Applies toK.S.A. 66-1,184 binds every utility providing retail electric service in Kansas: IOUs, electric cooperatives (incl. coop-owned utilities) and municipal utilities. NMECA (net metering) binds investor-owned utilities only (Evergy, Empire/Liberty). KCC-regulated utilities follow their KCC-approved rules with a standard interconnection process or FERC procedures; non-KCC-regulated utilities follow FERC procedures (66-1,184(k)).
Application formUtility-specific application under KCC-approved tariff (no statewide form found); utility may require application and verification of standards/codes (66-1,184(c)).
TimelinesAcknowledge receipt in writing within 30 days; approve or deny within 90 calendar days (not applicable if studies needed - estimate given); denial must state reasons and corrective actions (66-1,184(c)).
FeesUtility may charge a nonrefundable application fee, study costs (incl. SPP studies) and upgrade/equipment costs; no other fees unless authorized; no charge for exported power (66-1,184(c),(l)). NMECA: for pre-2014 net-metering customers no added interconnection fee (66-1265(d)).
External disconnectUtility may install a disconnecting device near the meter or require a utility-accessible switch or breaker (66-1,184(f)(5)). NMECA requires a UL-listed anti-islanding mechanism (66-1264(b)(5)).
Export compensationNEM – K.S.A. 66-1263 to 66-1271 (Net Metering and Easy Connection Act) as amended by 2024 HB 2527
IOUs only. Post-2014-07-01 systems: residential 15 kW, commercial/ag/government 100 kW, schools 150 kW AC export; monthly net excess credited at >=100% of monthly system average cost of energy; aggregate 2% (2024) rising to 5% of peak (2027); from 2026-01-01 generating capacity may exceed export capacity by max 50%. Pre-2014 systems: 25/200 kW with kWh carry-forward until 2030. Customers of IOUs may alternatively choose 66-1,184 parallel generation (avoided cost).
Coops and munis are bound by K.S.A. 66-1,184 parallel generation (export compensation >=100% avoided cost or LMP/system average cost option, 30/90-day timelines, sizing factor 0.288); non-KCC-regulated utilities follow FERC interconnection procedures. Not required to offer NMECA net metering.
- K.S.A. 66-1,184: https://ksrevisor.gov/statutes/chapters/ch66/066_001_0184.html (retrieved 2026-11-13)
- 2024 HB 2527 enrolled (NMECA amendments): https://kslegislature.gov/b2023_24/bills/download/?apn=b2023_24%2Fyear2%2Fready_for_publication%2Fhb_2527%2Fhb2527_enrolled.pdf (retrieved 2026-11-13)
Other utilities in Kansas
- Evergy (Kansas Central)343,712
- Evergy (Missouri Metro / Kansas Metro)247,426
- City of Kansas City62,103
- Midwest Energy Inc.29,779
- Wheatland Electric Cooperative, Inc.20,109
- FreeState Electric Cooperative17,654
- Victory Electric Cooperative Association Inc.14,374
- Prairie Land Electric Cooperative Inc.13,245
- Southern Pioneer Electric Company12,608
- City of Garden City10,458
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.