Kauai Island Utility Cooperative interconnection application

Kauai Island Utility Cooperative is an electric cooperative serving 30,335 residential customers in Hawaii (EIA-861, 2025). Gridpol files Kauai Island Utility Cooperative interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Hawaii’s commission rule (PUC-approved utility tariff Rule 14H (Hawaiian Electric Rule No. 14, Section H, with Appendix I technical requirements, Appendix II applications/agreements, Appendix III process overview); Dockets 2014-0192 and 2019-0323) does not bind electric cooperatives; Kauai Island Utility Cooperative sets its own interconnection policy. We confirm its form on the first project. No municipal utilities. KIUC (cooperative, PUC-regulated) follows its own PUC-approved interconnection tariff and DER programs.

Kauai Island Utility Cooperative at a glance

Utility

Kauai Island Utility Cooperative

Type

Electric cooperative

EIA utility ID

10071

Residential customers

30,335 (EIA-861, 2025)

Net-metered residential customers

6,221 (EIA-861, 2025)

Service territory

1 county in Hawaii

Documents Kauai Island Utility Cooperative asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Kauai Island Utility Cooperative. We confirm Kauai Island Utility Cooperative’s exact list on the first project.

Hawaii interconnection rule

Commission

Hawaii Public Utilities Commission (HI PUC)

Interconnection rule

PUC-approved utility tariff Rule 14H (Hawaiian Electric Rule No. 14, Section H, with Appendix I technical requirements, Appendix II applications/agreements, Appendix III process overview); Dockets 2014-0192 and 2019-0323 – Interconnection of Distributed Generating Facilities Operating in Parallel with the Company's Electric System · source

Applies to

Hawaiian Electric (Oahu, Hawaii Island, Maui County) via its PUC-approved tariff Rule 14H. No statewide administrative-code interconnection rule; Kauai Island Utility Cooperative (KIUC, PUC-regulated) has its own tariff rules (not reviewed).

Application form

Utility-specific Interconnection Application: Exhibit A to Appendix II, Appendix II-A or II-B (non-export, momentary parallel) or other Company-approved application, with standard interconnection agreement.

Timelines

Utility provides requirements and agreement within 5 business days of request; completeness review within 15 business days; Initial Technical Review within 15 business days of complete application; Supplemental Review 20 business days; IRS 150 calendar days; interconnection facilities identification 15 business days; executable agreement within 5 business days; fully executed agreement within 15 business days after customer-executed agreement and closed City/County permits (Rule 14H Appendix III).

Insurance

Per PUC D&O No. 22248 (Docket 03-0371) the utility does not impose a standardized insurance requirement; customer must carry commercially reasonable insurance or self-insure and disclose/provide evidence before executing the standard agreement (Appendix III Sec. 5). Program System Size is used to determine insurance requirements in agreements.

External disconnect

Customer furnishes a manual, visible-break isolation device (disconnect switch or rack-out breaker), accessible to and lockable open by utility personnel; existing service disconnect may be used if compliant; label 'Customer Generating Facility'. Interrupting device must be utility-accessible for facilities > 10 kW (Rule 14H App. I).

Export compensation

Utility-specific – HRS §§ 269-101 to 269-111 (net energy metering); PUC D&O No. 33258 (Oct. 12, 2015, Docket 2014-0192)
D&O 33258 closed retail NEM for Hawaiian Electric to new customers and created Customer Grid-Supply (fixed export credit) and Customer Self-Supply (non-export); later CGS+ / Smart Export (2018), and current Hawaiian Electric programs referenced in Rule 14H: Rule 22 Customer Self-Supply, Rule 27 NEM+, Rule 32 Smart Renewable Energy Program (Smart DER). Existing NEM customers grandfathered.

Not bound by the rule

No municipal utilities. KIUC (cooperative, PUC-regulated) follows its own PUC-approved interconnection tariff and DER programs.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited