Home › Utilities › Connecticut › Eversource Energy (Connecticut)
Investor-owned utilityEversource Energy (Connecticut) interconnection application
Eversource Energy (Connecticut) is an investor-owned utility serving 1,193,581 residential customers in Connecticut (EIA-861, 2025). Applications: PowerClerk (Eversource PowerClerk (CT)). Gridpol files Eversource Energy (Connecticut) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Process verified from Eversource Energy (Connecticut)’s official sources (see below). Joint residential guideline cited is May 2017 (20 kW) version; thresholds since raised. Verify current residential kW limit (25 vs 50 kW) and insurance requirement on first project.
Eversource Energy (Connecticut) at a glance
Connecticut Light & Power Co (Eversource Energy)
TypeInvestor-owned utility
EIA utility ID4176
Residential customers1,193,581 (EIA-861, 2025)
Net-metered residential customers90,904 (EIA-861, 2025)
Service territory8 counties in Connecticut
How to applyPowerClerk – Eversource PowerClerk (CT) · official link
Who submitsInstallers or their authorized agents apply on behalf of system owners/customers of record (RRES page); eversource.com user ID needed for PowerClerk.
Export compensationNet billing – Residential Renewable Energy Solutions (RRES) - Netting or Buy-All
RRES since 2022 for applications after 1/1/2022 (earlier: net metering). Buy-All: all output purchased, credits/payments; Netting: netting with REC incentive paid quarterly. Rate 980 alternative exists.
Residential inverter-based and Fast Track: 15 business days (Eversource CT table); joint guideline: receipt 3 BD, completeness 10 BD, contingent approval 15 BD, witness test request within 10 BD of inspector approval.
Documents Eversource Energy (Connecticut) asks for
- Interconnection application formPowerClerk webform, e-signed Gridpol prepares this.
- Single-line diagram (one-line)One-line electrical schematic with required elements (see rejection_reasons) Gridpol prepares this.
- Site plan / site layoutStructures, metering, transformers, AC disconnect location relative to meter Gridpol prepares this.
- Inverter spec sheetTechnical data sheets
- UL 1741 / IEEE 1547 certificationProof of UL 1741 and IEEE C62.41/C62.45
- Proof of insuranceProof of liability insurance (carrier, policy no., dates, limit); $300k for 0-100 kW per Eversource table; Eversource table also lists N/A for residential inverter-based track - verify
- Other utility-specific document (when applicable)RRES: Direct Ownership or Third Party Ownership Customer Disclosure Form; payment beneficiary forms
- Final inspection sign-offMunicipal electrical inspector approval after install
How the Eversource Energy (Connecticut) process runs
- Installer/authorized agent creates project in PowerClerk, completes interconnection application (and RRES enrollment, reviewed together), e-signs and pays fee.
- Utility acknowledges receipt (3 business days) and checks completeness (10 business days); incomplete applications are put on hold and may be deemed withdrawn if missing items are not supplied within 15 business days.
- Utility runs screens and issues Contingent Approval to interconnect (good-faith target 15 business days after complete application).
- Install system; obtain municipal electrical inspector approval.
- Utility may request commissioning/witness test within 10 business days of receiving inspector approval and schedules meter replacement/installation.
- Utility issues Authorization to Interconnect (PTO); do not operate before.
Fees
| Fee | Applies to | Note |
|---|---|---|
| $200 | Residential inverter-based (table says <=50 kW; guideline title says <=25 kW) | DG application fee |
| $163 | RRES application | |
| $230 / $282 | RRES meter fee | $230 120/240V 1-ph <400A (2S); $282 120/208V network (12S) |
| $500 | Fast Track (residential >50 kW; C&I <=2 MW) | |
| $1,000 + actual study cost | Study process >2 MW |
Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.
Size levels and limits
| Level | Up to | Note |
|---|---|---|
| Residential inverter-based | Eversource page: <=50 kW in fee table but <=25 kW in guideline title - conflicting | |
| Fast Track | 2000 kW | Residential >50 kW and C&I <=2 MW, 15 business days |
| Study Process | >2 MW, 105-120 business days |
Confirm residential threshold (25 vs 50 kW) in current PURA-approved guidelines.
Storage, EV and stamps
Battery storage
Eversource CT application page does not address storage (CT Energy Storage Solutions program not covered on interconnection pages).
PE stamp
Not stated for residential track on Eversource CT pages. – PE-stamped drawings are not included in Gridpol.
Common issues the utility lists
- Missing/incomplete material at completeness review -> application placed on hold; withdrawn if not cured within 15 business days (joint CT residential guidelines 2.3)
- One-line must show utility voltage at main panel, fuse symbol/size feeding inverter, inverter make/model/rating, breaker ratings, isolation device location, title block with customer name/address/revision
- Isolation device must be visible and within 10 ft of main utility panel unless clearly identified with written variance
Gridpol’s pre-submission check covers these before we file.
Sources
- Eversource CT - Application to Connect: https://www.eversource.com/residential/about/doing-business-with-us/interconnections/connecticut/connecticut-application-to-connect (retrieved 2026-11-13)
- Eversource CT - Renewable Energy Solutions (RRES) Interconnections: https://www.eversource.com/residential/about/doing-business-with-us/interconnections/connecticut/renewable-energy-solutions-interconnections (retrieved 2026-11-13)
- Eversource/UI joint Guidelines for Interconnection of Residential Single Phase Certified Inverter-Based Generating Facilities (Docket 03-01-15RE03, May 2017): https://www.eversource.com/Content/docs/default-source/ct---pdfs/guidelines-residential-interconnection.pdf?sfvrsn=2 (retrieved 2026-11-13)
Other utilities in Connecticut
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.