Eversource Energy (Connecticut) is an investor-owned utility serving 1,193,581 residential customers in Connecticut (EIA-861, 2025). Applications: PowerClerk (Eversource PowerClerk (CT)). Gridpol files Eversource Energy (Connecticut) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Eversource Energy (Connecticut)’s official sources (see below). Joint residential guideline cited is May 2017 (20 kW) version; thresholds since raised. Verify current residential kW limit (25 vs 50 kW) and insurance requirement on first project.

Eversource Energy (Connecticut) at a glance

Utility

Connecticut Light & Power Co (Eversource Energy)

Type

Investor-owned utility

EIA utility ID

4176

Residential customers

1,193,581 (EIA-861, 2025)

Net-metered residential customers

90,904 (EIA-861, 2025)

Service territory

8 counties in Connecticut

How to apply

PowerClerk – Eversource PowerClerk (CT) · official link

Who submits

Installers or their authorized agents apply on behalf of system owners/customers of record (RRES page); eversource.com user ID needed for PowerClerk.

Export compensation

Net billing – Residential Renewable Energy Solutions (RRES) - Netting or Buy-All
RRES since 2022 for applications after 1/1/2022 (earlier: net metering). Buy-All: all output purchased, credits/payments; Netting: netting with REC incentive paid quarterly. Rate 980 alternative exists.

Review time (official)

Residential inverter-based and Fast Track: 15 business days (Eversource CT table); joint guideline: receipt 3 BD, completeness 10 BD, contingent approval 15 BD, witness test request within 10 BD of inspector approval.

Documents Eversource Energy (Connecticut) asks for

  • Interconnection application formPowerClerk webform, e-signed Gridpol prepares this.
  • Single-line diagram (one-line)One-line electrical schematic with required elements (see rejection_reasons) Gridpol prepares this.
  • Site plan / site layoutStructures, metering, transformers, AC disconnect location relative to meter Gridpol prepares this.
  • Inverter spec sheetTechnical data sheets
  • UL 1741 / IEEE 1547 certificationProof of UL 1741 and IEEE C62.41/C62.45
  • Proof of insuranceProof of liability insurance (carrier, policy no., dates, limit); $300k for 0-100 kW per Eversource table; Eversource table also lists N/A for residential inverter-based track - verify
  • Other utility-specific document (when applicable)RRES: Direct Ownership or Third Party Ownership Customer Disclosure Form; payment beneficiary forms
  • Final inspection sign-offMunicipal electrical inspector approval after install

How the Eversource Energy (Connecticut) process runs

  1. Installer/authorized agent creates project in PowerClerk, completes interconnection application (and RRES enrollment, reviewed together), e-signs and pays fee.
  2. Utility acknowledges receipt (3 business days) and checks completeness (10 business days); incomplete applications are put on hold and may be deemed withdrawn if missing items are not supplied within 15 business days.
  3. Utility runs screens and issues Contingent Approval to interconnect (good-faith target 15 business days after complete application).
  4. Install system; obtain municipal electrical inspector approval.
  5. Utility may request commissioning/witness test within 10 business days of receiving inspector approval and schedules meter replacement/installation.
  6. Utility issues Authorization to Interconnect (PTO); do not operate before.

Fees

FeeApplies toNote
$200Residential inverter-based (table says <=50 kW; guideline title says <=25 kW)DG application fee
$163RRES application
$230 / $282RRES meter fee$230 120/240V 1-ph <400A (2S); $282 120/208V network (12S)
$500Fast Track (residential >50 kW; C&I <=2 MW)
$1,000 + actual study costStudy process >2 MW

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Residential inverter-basedEversource page: <=50 kW in fee table but <=25 kW in guideline title - conflicting
Fast Track2000 kWResidential >50 kW and C&I <=2 MW, 15 business days
Study Process>2 MW, 105-120 business days

Confirm residential threshold (25 vs 50 kW) in current PURA-approved guidelines.

Storage, EV and stamps

Battery storage

Eversource CT application page does not address storage (CT Energy Storage Solutions program not covered on interconnection pages).

PE stamp

Not stated for residential track on Eversource CT pages. – PE-stamped drawings are not included in Gridpol.

Common issues the utility lists

  • Missing/incomplete material at completeness review -> application placed on hold; withdrawn if not cured within 15 business days (joint CT residential guidelines 2.3)
  • One-line must show utility voltage at main panel, fuse symbol/size feeding inverter, inverter make/model/rating, breaker ratings, isolation device location, title block with customer name/address/revision
  • Isolation device must be visible and within 10 ft of main utility panel unless clearly identified with written variance

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited