Home › Utilities › Vermont › Village of Jacksonville
Municipal utilityVillage of Jacksonville interconnection application
Village of Jacksonville is a municipal utility serving 735 customers in Vermont (EIA-861, 2025). Gridpol files Village of Jacksonville interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.
Get started Look up another ZIP
Vermont’s interconnection rule (Vermont PUC Rule 5.500 (5.501-5.522), Interconnection Procedures for Proposed Electric Generation Resources and Energy Storage Devices) applies to Village of Jacksonville. Levels, timelines and documents below come from that rule; Village of Jacksonville’s own form and portal are confirmed on the first project.
Village of Jacksonville at a glance
Village of Jacksonville
TypeMunicipal utility
EIA utility ID9610
Customers735 (EIA-861, 2025, short form: all customer classes)
Net-metered residential customersnone reported
Service territory1 county in Vermont
Documents Village of Jacksonville asks for
- Interconnection application formRequired by the state rule Gridpol prepares this.
- Single-line diagram (one-line)Required by the state rule Gridpol prepares this.
- Inverter spec sheetRequired by the state rule
- UL 1741 / IEEE 1547 certificationRequired by the state rule
- Interconnection agreementRequired by the state rule
- Other utility-specific documentRequired by the state rule
Documents required by the Vermont rule. Village of Jacksonville may ask for more on its own form; we confirm on the first project.
Vermont interconnection rule
Vermont Public Utility Commission (PUC)
Interconnection ruleVermont PUC Rule 5.500 (5.501-5.522), Interconnection Procedures for Proposed Electric Generation Resources and Energy Storage Devices – Interconnection Procedures for Proposed Electric Generation Resources and Energy Storage Devices · source
Applies toAll proposed interconnections of Projects in Vermont not subject to ISO-NE interconnection rules (5.501), i.e., all Vermont distribution utilities (Green Mountain Power, municipal utilities, Vermont Electric Cooperative, Washington Electric Cooperative, etc.).
Application formStatewide Commission Application Forms: 'Application for Interconnection of Distributed Energy Resources Not Greater Than 150 kW' and '... Greater Than 150 kW' (5.502(2),(4)).
TimelinesIncomplete-application notice within 7 days; for <= 500 kW the utility must notify interconnection issues by day 15 (export <= 15 kW) or day 31 (export 15-500 kW) after complete application (5.510). Projects passing preliminary screens must be approved in writing; projects < 150 kW may interconnect without an Interconnection Agreement unless operating restrictions are imposed; > 150 kW: executable agreement within 7 days after preliminary review. Optional pre-application report $300.
FeesNo application fee for nameplate <= 150 kW unless provided in an approved utility tariff; > 150 kW $600 (or tariff); pre-application report $300; feasibility study deposit lesser of 50% of estimate or $1,000.
Export compensationNet billing – 30 V.S.A. § 8010; Vermont PUC Rule 5.100 (eff. Mar. 1, 2024)
Net-metering systems up to 500 kW; Category I <= 15 kW (non-hydro), Category II 15-150 kW, Categories III/IV up to 500 kW (preferred sites etc.). Registration (roof-mounted up to 500 kW, ground-mounted <= 15 kW) or CPG application. Excess generation monetized at the applicable blended residential rate plus/minus siting and REC adjustors (first 10 years for positive adjustors), updated in biennial proceedings (5.127-5.128). Applies to all Vermont electric companies.
Bound: Rule 5.500 and Rule 5.100 apply statewide to all Vermont utilities including municipal utilities and cooperatives (PUC regulates all).
- VT PUC Rule 5.500 (rev. 03/01/2024): https://puc.vermont.gov/sites/psbnew/files/documents/5500-interconnection-procedures-for-proposed-electric-generation-resources-and-energy-storage-devices.pdf (retrieved 2026-11-13)
- VT PUC Rule 5.100 Net-Metering (eff. Mar. 1, 2024): https://puc.vermont.gov/sites/psbnew/files/documents/rule-5.100-clean-final-11-12-2024.pdf (retrieved 2026-11-13)
- VT PUC Current Rules and General Orders: https://puc.vermont.gov/about-us/statutes-and-rules/current-rules-and-general-orders (retrieved 2026-11-13)
$500 / month
Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.
- Unlimited interconnection applications
- Single-line diagram and site plan for every application
- Pre-submission check against the utility’s requirements
- Homeowner e-signature link for the authorization
- Filing in your utility portal accounts or by the utility’s method
- Utility questions, corrections and resubmissions
- Follow-up through approval, inspection and PTO
- Customer list, exports, API and webhooks
Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.