Home › Utilities › Rhode Island › Rhode Island Energy

Investor-owned utility

Rhode Island Energy interconnection application

Rhode Island Energy is an investor-owned utility serving 458,174 residential customers in Rhode Island (EIA-861, 2025). Applications: Own online portal (Rhode Island Energy PortalConnect (Salesforce)). Gridpol files Rhode Island Energy interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Rhode Island Energy’s official sources (see below). Simplified fee and storage rules not captured - check R.I.P.U.C. 2258 on first project.

Rhode Island Energy at a glance

Utility

The Narragansett Electric Co (PPL Corporation)

Type

Investor-owned utility

EIA utility ID

13214

Residential customers

458,174 (EIA-861, 2025)

Net-metered residential customers

19,892 (EIA-861, 2025)

Service territory

5 counties in Rhode Island

How to apply

Own online portal – Rhode Island Energy PortalConnect (Salesforce) · official link

Who submits

Contractors (electricians, developers, design engineers) prepare and submit on behalf of Interconnecting Customer; Legal Information Document lists contacts.

Export compensation

NEM – Net Metering (Schedule B) or Renewable Energy Growth (RE Growth) small solar
RE Growth requires dual meters/production metering

Review time (official)

Tariff: acknowledge receipt 3 business days; completeness 10 business days.

Documents Rhode Island Energy asks for

  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutSite diagram Gridpol prepares this.
  • PV module spec sheetCut sheets/specs for all equipment (PDF only)
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Interconnection application formExhibit A Simplified Interconnection Application Gridpol prepares this.
  • Other utility-specific documentLegal Information Document; Exhibit I/H Retail Customer Agreement if applicable
  • Net metering / net billing agreement (when applicable)Schedule B for net metering
  • Recent electric bill (when applicable)Recent bill for existing customers
  • Other utility-specific document (when applicable)RE Growth: payment/credit transfer, REC assignment, ACH, W-9, ownership affidavit, disclosure forms
  • Final inspection sign-offExhibit A2 Certificate of Completion filled during municipal electrical inspection + Simplified completion checklist

How the Rhode Island Energy process runs

  1. Request new/upgraded service first if needed (Work Request no., pending account no.).
  2. Submit Simplified IA materials via PortalConnect.
  3. CEI representative assigns application number; when complete, countersigns IA form (Simplified approval).
  4. Construct; municipal electrical inspection; Certificate of Completion.
  5. Submit completion documentation; possible witness test.
  6. Net meter installation; Authorization to Interconnect before operation.

Size levels and limits

LevelUp toNote
Simplified25 kWInverter-based, export <=25 kW on radial systems passing screens (R.I.P.U.C. 2258)
Expedited/Standard

Common issues the utility lists

  • Upgraded service requested on account with pending IA is held until Conditional Approval
  • RE Growth: only listed dual-meter installation methods accepted; inside meters must be moved outside

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.