Home › Utilities › Rhode Island › Clear River Electric & Water District (CREW, formerly Pascoag Utility District)

Municipal utility

Clear River Electric & Water District (CREW, formerly Pascoag Utility District) interconnection application

Clear River Electric & Water District (CREW, formerly Pascoag Utility District) is a municipal utility serving 4,388 residential customers in Rhode Island (EIA-861, 2025). Applications: PDF + mail (Service location card and interconnection information submitted to CREW office (no online application)). Gridpol files Clear River Electric & Water District (CREW, formerly Pascoag Utility District) interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from Clear River Electric & Water District (CREW, formerly Pascoag Utility District)’s official sources (see below). Submission channel (CREW office), documents and steps confirmed from CREW page and RIPUC 902. Gaps: service location card form and any application fee not online; no stated review timelines; no battery/storage rules; credit payout wording differs between policy and website.

Clear River Electric & Water District (CREW, formerly Pascoag Utility District) at a glance

Utility

Clear River Electric and Water District

Type

Municipal utility

EIA utility ID

14537

Residential customers

4,388 (EIA-861, 2025)

Net-metered residential customers

8 (EIA-861, 2025)

Service territory

1 county in Rhode Island

How to apply

PDF + mail – Service location card and interconnection information submitted to CREW office (no online application)

Who submits

Interconnecting customer (owner-occupied residential, up to three-family) with its solar/wind installer; installer works with customer and Town Building office; customer fills out the service location card with CREW.

Export compensation

Buy-all/sell-all – RIPUC No. 902 Electric Net Metering Policy (eff. Jan 1, 2022)
Two meters (consumption + generation); all metered generation credited at CREW Power Supply Service rate (website: $0.071693/kWh, changes annually). Policy: excess credits after December billing cycle paid by check in Q1; website: check on request if credit maintained for two or more annual reconciliations.

Documents Clear River Electric & Water District (CREW, formerly Pascoag Utility District) asks for

  • Other utility-specific documentService location card filed with CREW office to approve location of net metering meters (form not online)
  • Single-line diagram (one-line)Electrical one-line diagram or sketch showing inverter connection relative to service entrance panel and revenue meters (RIPUC 902) Gridpol prepares this.
  • Inverter spec sheetMake, model and manufacturer's specification sheet for the inverter (RIPUC 902)
  • UL 1741 / IEEE 1547 certificationInverter must meet UL 1741; PV installed per IEEE 929-2000; interconnection approved when CREW determines UL 1741 compliance
  • Final inspection sign-offCertificate of inspection from Burrillville Town Building office before CREW installs metered service

How the Clear River Electric & Water District (CREW, formerly Pascoag Utility District) process runs

  1. Choose installer; contact Town (Burrillville) Building office for permits
  2. Installer reviews RIPUC 902 Net Metering Policy
  3. After design: fill out service location card with CREW to approve meter location; submit one-line diagram and inverter spec sheet for CREW review/approval
  4. Install second meter socket (line side) and outside, labeled, unlocked manual disconnect within 10 ft of generation meter
  5. Town Building office issues certificate of inspection
  6. CREW installs consumption and generation meters; monthly generation credit

Fees

FeeApplies toNote
monthly meter charge (if any)Generation meterper applicable CREW tariff; customer pays reasonable metering/data equipment costs (RIPUC 902)

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Net Metering Policy RIPUC 90210 kWlarger applications reviewed case by case
Net metering cap10 kW

Residential owner-occupied single-family up to three-family only; inverter-based only; aggregate circuit generation <=10% of max fault current; <=20% imbalance on 240 V center-tap service.

Common issues the utility lists

  • Inverter not UL 1741 compliant
  • Non-inverter-based generation
  • Property not owner-occupied residential (max three-family)
  • Capacity >10 kW (case-by-case review)

Gridpol’s pre-submission check covers these before we file.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited