Home › Utilities › Nebraska › Village of Chester

Municipal utility

Village of Chester interconnection application

Village of Chester is a municipal utility serving 193 customers in Nebraska (EIA-861, 2025). Gridpol files Village of Chester interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Nebraska’s interconnection rule (Neb. Rev. Stat. 70-2001 to 70-2005 (LB 436, 2009)) applies to Village of Chester. Levels, timelines and documents below come from that rule; Village of Chester’s own form and portal are confirmed on the first project.

Village of Chester at a glance

Utility

Village of Chester

Type

Municipal utility

EIA utility ID

3445

Customers

193 (EIA-861, 2025, short form: all customer classes)

Net-metered residential customers

none reported

Service territory

1 county in Nebraska

Wholesale supplier / association

Nebraska Public Power District (NPPD) - wholesale customers

Documents Village of Chester asks for

  • Interconnection agreementRequired by the state rule
  • Final inspection sign-offRequired by the state rule

Documents required by the Nebraska rule. Village of Chester may ask for more on its own form; we confirm on the first project.

Nebraska interconnection rule

Commission

Nebraska Power Review Board (no PUC jurisdiction over electric rates; all retail electric service is public power)

Interconnection rule

Neb. Rev. Stat. 70-2001 to 70-2005 (LB 436, 2009) – Net metering and interconnection of qualified facilities · source

Applies to

All local distribution utilities (owner/operator of the local distribution system) - in Nebraska these are public power districts, municipal utilities and cooperatives; there is no commission-administered interconnection rule. Each utility uses its own interconnection agreement meeting the statute.

Application form

Utility-specific interconnection agreement (statute requires an interconnection agreement establishing financial, interconnection, safety, performance and reliability requirements)

Timelines

Customer must notify the utility of intent to install at least 60 days before installation and provide State Electrical Division inspection documentation before interconnection (70-2004). No utility review deadlines in statute.

Fees

No additional standby, capacity, demand, interconnection or other fee for qualified facilities; customer pays utility costs for equipment/services required only because of the interconnection; bidirectional meter at no additional cost.

Insurance

Utility may not require additional liability insurance if all safety and interconnection requirements are met (70-2003(6)(c)).

External disconnect

Statute requires automatic isolation on outage and bars additional safety equipment/charges beyond statutory standards; no explicit external disconnect rule.

Export compensation

NEM – Neb. Rev. Stat. 70-2002(6), 70-2003(4)-(5)
Retail-rate offset up to monthly usage; net excess generation credited at the utility's avoided cost, carried forward as monetary credits and paid out at end of annualized period. Utility may stop at 1% of average aggregate monthly peak demand forecast. Utilities may voluntarily offer net metering above 25 kW.

Not bound by the rule

The statute itself binds all public power districts, municipal utilities and cooperatives; utility-specific policies apply above 25 kW.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited