LES is a municipal utility serving 136,859 residential customers in Nebraska (EIA-861, 2025). Applications: Own online portal (LES Application for Review of Interconnection of Customer-Owned Generation (online form)). Gridpol files LES interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Process verified from LES’s official sources (see below). Fees, timelines and document list beyond application not stated.

LES at a glance

Utility

Lincoln Electric System (City of Lincoln)

Type

Municipal utility

EIA utility ID

11018

Residential customers

136,859 (EIA-861, 2025)

Net-metered residential customers

604 (EIA-861, 2025)

Service territory

1 county in Nebraska

How to apply

Own online portal – LES Application for Review of Interconnection of Customer-Owned Generation (online form) · official link

Who submits

Customer ('Owner') requests review; installer not addressed on page.

Export compensation

NEM – LES Net Metering (<=25 kWAC); Renewable Generation rate (<=100 kWAC, all energy purchased)
Net excess credited at renewable rate based on residential retail energy rate

Documents LES asks for

  • Interconnection application formApplication for Review of Interconnection (device location, PV/batteries/generators, max net AC output at LES interface) Gridpol prepares this.
  • Final inspection sign-offBuilding permit + Application for Electric Service with AHJ
  • Interconnection agreementNet Metering <=25 kWAC Agreement, or Renewable Generation <=100 kWAC Agreement, or other agreement by type

How the LES process runs

  1. Determine generator type/size/site
  2. Building permit + Application for Electric Service with AHJ
  3. Submit Application for Review of Interconnection to LES
  4. Install after LES notice to proceed
  5. Return signed interconnection agreement
  6. LES inspects; if acceptable, customer may interconnect

Fees

FeeApplies toNote
>100 kWACStudy Deposit Agreement

Utility fees are paid by the installer or customer; they are not part of the Gridpol plan.

Size levels and limits

LevelUp toNote
Net metering25 kWkWAC
Renewable generation (sell all)100 kWkWAC
>100 kWACStudy deposit, separate agreement
Net metering cap25 kW

Storage, EV and stamps

Battery storage

Batteries listed on application; no further rules on page.

Sources

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited