Home › Utilities › Idaho

Idaho

Idaho interconnection applications

32 electric utilities serve Idaho (EIA-861, 2025): 3 investor-owned utilitys, 17 electric cooperatives, 11 municipal utilitys, 1 federal power agency. Together they serve 852,218 residential customers; 23,850 residential customers were on net metering at year-end 2025.

Largest utilities in Idaho

Idaho PowerProcess verified

Investor-owned utility · 554,211 residential customers · Idaho

Applications: Own online portal – Idaho Power Customer Generation online application form

Interconnection process and documents →
Avista UtilitiesProcess verified

Investor-owned utility · 376,350 residential customers · Idaho

Applications: PowerClerk – Avista SGI PowerClerk

Interconnection process and documents →
Rocky Mountain Power (UT, ID, WY) / Pacific Power (OR, WA, CA)Process verified

Investor-owned utility · 1,867,246 residential customers · Idaho

Applications: PowerClerk – PacifiCorp Net Metering / Customer Generation PowerClerk (all six states)

Interconnection process and documents →
Kootenai Electric CooperativeState guidance

Electric cooperative · 31,097 residential customers · Idaho

Interconnection process and documents →
City of Idaho FallsState guidance

Municipal utility · 29,403 residential customers · Idaho

Interconnection process and documents →
Northern Lights, Inc.State guidance

Electric cooperative · 22,890 residential customers · Idaho

Interconnection process and documents →
Fall River Rural Electric Cooperative Inc.State guidance

Electric cooperative · 17,824 residential customers · Idaho

Interconnection process and documents →
United Electric Co-op, Inc.State guidance

Electric cooperative · 5,169 residential customers · Idaho

Interconnection process and documents →
Salmon River Electric Cooperative Inc.State guidance

Electric cooperative · 2,426 residential customers · Idaho

Interconnection process and documents →
Inland Power & Light CompanyState guidance

Electric cooperative · 44,526 residential customers · Idaho

Interconnection process and documents →
Lower Valley Energy Inc.State rule applies

Electric cooperative · 24,835 residential customers · Idaho

Interconnection process and documents →
Raft Rural Electric Cooperative Inc.State guidance

Electric cooperative · 3,352 residential customers · Idaho

Interconnection process and documents →

Export compensation among the researched Idaho utilities: Net billing, NEM. Rules differ by utility – see each utility page.

Idaho interconnection rule

Absence of a statewide IPUC rule inferred from utility-tariff structure (DSIRE not readable from server, search budget exhausted). Avista and RMP Idaho tariffs not reviewed.

Commission

Idaho Public Utilities Commission

Interconnection rule

No statewide small-generator interconnection rule found; utility-specific IPUC-approved tariffs (e.g., Idaho Power Schedule 68 'Interconnections to Customer Distributed Energy Resources', approved per Order No. 36892, eff. 2026-01-01) – Utility-specific interconnection tariffs · source

Applies to

IPUC-regulated IOUs each have their own tariff (Idaho Power, Avista, Rocky Mountain Power in Idaho). Idaho Power Schedule 68 applies to all customer generators in its Idaho service area qualifying for Schedules 6, 8, 84 or non-export.

Application form

Utility-specific application (Idaho Power: application form on its website / 'Apply to Connect Your System'; DERs >=3 MVA sign Uniform Customer Generator Interconnection Agreement)

Timelines

Idaho Power Schedule 68: incomplete applications withdrawn after 60 days; Feasibility Review within 7 business days (15 business days if additional studies); Feasibility Study agreement returned within 15 business days.

Fees

Idaho Power: $100 non-refundable application fee (also for modifications/expired applications); $1,000 Feasibility Study deposit; upgrades under Rule H.

Insurance

Idaho Power: $1,000,000 CGL per occurrence required in the Uniform Customer Generator Interconnection Agreement (DERs >=3 MVA); no insurance requirement found for smaller DERs in Schedule 68.

External disconnect

Idaho Power: Disconnection Equipment required for all customer DERs - lockable with Company padlock, visible break (circuit breakers do not qualify), labeled 'Generation Disconnect Switch', within 10 ft of interconnection point or with posted location instructions.

Export compensation

Net billing – Utility-specific (Idaho Power Schedules 6, 8, 84)
No statewide net metering statute. Idaho Power: net billing with variable export credit rate (current ECR held until April 2028 filing); Schedules 6/8 up to 25 kW, Schedule 84 up to greater of 12-month max demand or 100 kW; inverter systems measured by AC nameplate.

Not bound by the rule

Municipal utilities and electric cooperatives are not rate-regulated by the IPUC and set their own interconnection and net metering policies.

LevelUp toCriteria / review / fee
Idaho Power: DER < 3 MVA (Section 2 process)3000 kWFeasibility Review; Feasibility Study if needed · Feasibility Review 7 business days (additional studies 15 business days) · $100 non-refundable application fee; Feasibility Study deposit $1,000
Idaho Power: DER >= 3 MVAthree-step study process (feasibility, system impact, facility study); Uniform Customer Generator Interconnection Agreement · study deposits; facility study deposit 5% of project cost capped at $30,000
Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited