Home › Utilities › Alabama › Clarke-Washington E M C

Electric cooperative

Clarke-Washington E M C interconnection application

Clarke-Washington E M C is an electric cooperative serving 18,723 residential customers in Alabama (EIA-861, 2025). Gridpol files Clarke-Washington E M C interconnection applications for licensed installers – solar, storage and EV chargers – with single-line diagram and site plan, unlimited for $500 a month.

Get started Look up another ZIP

Alabama’s commission rule (No statewide interconnection rule or net metering statute found; utility-specific policies (Alabama Power: Southern Company Interconnection Policy, DER Technical Interconnection Requirements Guidebook, Rate Rider RGB, Rate PAE/CPE)) does not bind electric cooperatives; Clarke-Washington E M C sets its own interconnection policy. We confirm its form on the first project. Municipal utilities and cooperatives (many TVA distributors in north Alabama; PowerSouth members in south) set their own interconnection/buyback policies.

Clarke-Washington E M C at a glance

Utility

Clarke-Washington E M C

Type

Electric cooperative

EIA utility ID

40127

Residential customers

18,723 (EIA-861, 2025)

Net-metered residential customers

none reported

Service territory

4 counties in Alabama

Documents Clarke-Washington E M C asks for

  • Interconnection application formFilled in by us from your project data in the utility’s portal or on its form. Gridpol prepares this.
  • Single-line diagram (one-line)Drawn by us from your equipment data: modules, strings, inverter, battery, disconnects, point of interconnection, meter. Gridpol prepares this.
  • Site plan / site layoutDrawn by us from your roof sketch or photos: array, inverter, battery, disconnect, meter and main panel locations. Gridpol prepares this.
  • PV module spec sheetManufacturer data sheet of the modules.
  • Inverter spec sheetManufacturer data sheet (string inverter, microinverter or hybrid inverter).
  • Customer signatureThe account holder signs the application or authorization. We send the signature link.
  • Recent electric billName, service address, account and meter number must match the application.
  • Final inspection sign-offApproved electrical inspection from the authority having jurisdiction after installation.

Typical documents for US utilities – not yet verified for Clarke-Washington E M C. We confirm Clarke-Washington E M C’s exact list on the first project.

Alabama interconnection rule

Absence of statewide rule not confirmed against DSIRE (not readable from server) or PSC rules; Alabama Power process documents linked but not read.

Commission

Alabama Public Service Commission

Interconnection rule

No statewide interconnection rule or net metering statute found; utility-specific policies (Alabama Power: Southern Company Interconnection Policy, DER Technical Interconnection Requirements Guidebook, Rate Rider RGB, Rate PAE/CPE) – Utility-specific · source

Applies to

No commission-wide rule identified. Alabama Power (PSC-regulated IOU) applies its own interconnection policy; TVA-served municipal utilities and cooperatives follow TVA/own policies.

Application form

Alabama Power: online application via PowerClerk (alabamapowerder.powerclerk.com); approval required before purchasing/installing

Export compensation

None statewide
Alabama Power: no net metering; interconnected customers subject to Rate Rider RGB (supplementary/back-up/maintenance power); excess energy purchased under Rate PAE (<100 kW) or Rate CPE (>=100 kW).

Not bound by the rule

Municipal utilities and cooperatives (many TVA distributors in north Alabama; PowerSouth members in south) set their own interconnection/buyback policies.

Gridpol Unlimited

$500 / month

Unlimited interconnection applications. 12-month agreement, signed online. The agreement starts the day you sign; first invoice right away, then monthly.

  • Unlimited interconnection applications
  • Single-line diagram and site plan for every application
  • Pre-submission check against the utility’s requirements
  • Homeowner e-signature link for the authorization
  • Filing in your utility portal accounts or by the utility’s method
  • Utility questions, corrections and resubmissions
  • Follow-up through approval, inspection and PTO
  • Customer list, exports, API and webhooks
Get started

Applications are typically submitted within 2 business days after complete documents. Utility review times are set by each utility.

Get started – $500/month unlimited